Page 24-18
Version 1.7
23 June 2015
Steps
To replace the tooth belt pretreatment cup, follow
the steps in
STEP ACTION
1.
) of the clamping block at the
upper side of the milking box.
Figure 24-27 Clamping block upper side milking box
2.
Unscrew the bolts of the clamping block (1) (see
) above
the pretreatment hose.
1
Summary of Contents for MR-D1
Page 1: ...Service Manual Original Service Manual Version 1 7 23 June 2015...
Page 8: ......
Page 10: ......
Page 30: ......
Page 50: ......
Page 74: ......
Page 102: ......
Page 126: ......
Page 140: ......
Page 142: ......
Page 170: ......
Page 182: ......
Page 192: ......
Page 206: ......
Page 224: ......
Page 312: ......
Page 342: ......
Page 416: ......
Page 436: ......