Celsius Platinum Inverter Heat Pump
Installation & User Manual
20
Model
PL13HP
PL17HP
PL21HP
PL26HP
PL32HP
Breaker
Rated Current A
15.0
19.0
22.5
24.5
28.5
Rated Residual Action Current mA
30
30
30
30
30
Fuse A
15.0
19.0
22.5
24.5
28.5
Power Cord (mm
2
)
3x2.5
3x4
3x4
3x6
3x6
Signal Cable (mm
2
)
3x0.5
3x0.5
3x0.5
3x0.5
3x0.5
OPTION FOR PROTECTING DEVICES AND CABLE SPECIFICATION
NOTE:
The above data is adapted to power cord ≤ 10m .If power cord is >10m, wire diameter must be increased.
The signal cable can be extended to 50m at most.
Inspection before use
Trial
5.3.1
5.3.2
5.3 TRIAL AFTER INSTALLATION
Check installation of the whole heat pump and the pipe connections according to the pipe
connecting drawing
The user is advised to start the water pump before the heat pump, and turn off the heat pump before
the water pump for long life circle.
Check the electric wiring according to the electrical wiring diagram and earthing connection
The user should start the water pump, and check for any leakage of water; power on and press the
ON/OFF button of the heat pump, and set desired temperature in the thermostat.
Make sure that the main power is well connected
In order to protect the heat pump, the heat pump is equipped with start delay function. When starting
the heat pump, the fan will start to run in 3 minutes, in another 30 seconds, the compressor will start to
run.
Check if there is any obstacle in front of the air inlet and outlet of the heat pump.
After pool heat pump starts up, check for any abnormal noise from the heat pump.
Check the temperature setting.
1
1
2
2
3
3
4
4
5
!
ATTENTION
Please check all the wirings carefully before turning on the heat pump.