Boss BCONDP Installation Instructions Download Page 3

3

ELECTRICAL CONNECTIONS

1. Shut off electrical power at fuse box before making any connections. All wiring must comply with local

codes.

2. Line voltage: Connect pump to voltage specified on label located on pump. Wiring is as follows:

Live - Brown

Neutral - Blue

Earth - Yellow/Green

3. If fused plug is used, a 1.0 amp fuse is recommended.

4. High level float switch connection options. The pump is fitted with a secondary float which will trigger a micro

switch just before the pump starts to over spill. This switch can be used to either switch off the boiler or signal

an external alarm (visual or audible alarms are available as option extras). The following diagrams show how

the high level float switch can be connected. (Fig 3 and Fig 4).

It is strongly recommended that either of these options is selected, if the pump where ever to over spill

the dilute acid condensate could cause damage to property.

Figure 3. Boiler Connection to high level float Figure 4. Alarm Connection to high level float

Switch

switch

L

N

L

L

N

N

E

E

E

NO COM NC

3

2

1

4

3

2

1

1

2

2

1

3

3

Condensate Pump

Boiler Connector

Fused Spur/Socket

Junction

Box

BR

BL

G/Y

Bk

Bk

L

N

L

L

N

N

E

E

E

NO COM NC

3

2

1

4

3

2

1

1

2

2

1

3

3

Condensate Pump

Boiler Connector

Fused Spur/Socket

Junction

Box

BR

BL

G/Y

Bk

Bk

L

N

L

L

N

N

E

E

E

NO NC COM

3

2

1

3

2

1

1

2

2

1

3

3

Condensate Pump

Boiler Connector

Fused Spur/Socket

BR

BL

G/Y

Bk

Bk

Junction

Box

Audible Alarm

L

N

L

L

N

N

E

E

E

NO NC COM

3

2

1

3

2

1

1

2

2

1

3

3

Condensate Pump

Boiler Connector

Fused Spur/Socket

BR

BL

G/Y

Bk

Bk

Junction

Box

Audible Alarm

WATER DRAIN CONNECTIONS

Inlet Water Connections

1. Position pump beneath boiler condensate drain so that condensate flows into the pump inlet freely (use any

of the three openings provided).

2. The pump will accept up to three drain lines, although care should be used to make certain that total inflow

does not exceed outflow of pump. If more drains into the pump than the rated output of the pump, tank may

overflow.

3. Keep plugs in unused pump inlet openings to prevent debris from falling into the pump tank.

Outlet Water Connections

1. Connect the supplied 3/8" I.D. tubing to the non return valve (Fig 1). For best results, secure tubing with

clamps (not provided) but do not pinch collapse or otherwise restrict the tubing.

2. The pump is supplied with an adaptor which can be connected to standard 22mm pipe or with associated

adaptors (not supplied) to 32mm and 40mm pipe.

3. Tubing should rise vertically but not exceed the maximum shut off head (pumping height) of 4.3 metre above

the pump.

4. At highest point angle tubing horizontally and create a downward slope to the drainage point. Do not sharply

bend or twist the tubing in a way that might result in collapse or restriction of the tubing. Creating a downward

slope will allow the condensate to drain by gravity and keep tubing empty.

5. If it is not possible to create a downward slope, try to create an inverted

U

trap directly above the pump at

the highest point.

Reviews: