background image

www.bia.lighting  |  [email protected]

page 2 / 2

PRODUCT MANUAL

COPYRIGHT BIA 

©

2019

 

V

10.19

INSTALLATION INSTRUCTIONS

1. 

Before commencing installation, ensure the main power is 
switched off.   

2. 

Prepare in-ground hole size of 300mm³.

3. 

Lay conduit and set cage in place. Pour in concrete and fill up.  

4. 

Prepare wiring when concrete has cured.  

5. 

Place base plate over cage, secure with washer and nut. 

6. 

Connect and waterproof all wiring. 

7. 

Place bollard over base plate, secure with Allen key. 

8. 

Turn on main power.

WARNING! All Wiring and connection points must be waterproofed 
to the required IP rating.

800mm

Ø140mm

Ø100mm

200mm

conduit

concrete

base plate

cage

Ø13mm

DIAMENSION DIAGRAM

3

4

5

7

2

Reviews: