www.bia.lighting | [email protected]
page 2 / 2
PRODUCT MANUAL
COPYRIGHT BIA
©
2019
V
10.19
INSTALLATION INSTRUCTIONS
1.
Before commencing installation, ensure the main power is
switched off.
2.
Prepare in-ground hole size of 300mm³.
3.
Lay conduit and set cage in place. Pour in concrete and fill up.
4.
Prepare wiring when concrete has cured.
5.
Place base plate over cage, secure with washer and nut.
6.
Connect and waterproof all wiring.
7.
Place bollard over base plate, secure with Allen key.
8.
Turn on main power.
WARNING! All Wiring and connection points must be waterproofed
to the required IP rating.
800mm
Ø140mm
Ø100mm
200mm
conduit
concrete
base plate
cage
Ø13mm
DIAMENSION DIAGRAM
3
4
5
7
2