Dinion Infrared Imager
Installation | en
19
Bosch Security Systems, Inc.
User Manual
F.01U.263.417 | 3.0 | 2012.01
4.2
Mount the Junction Box
Figure 4.1
Interior of the Junction Box
1.
Decide which holes in the junction box to use to insert the
power wires, video, and control data wires: the holes in
the bottom of the box, the holes in the back of the box, or
the holes in the side of the box.
2.
If necessary, before mounting, move the two (2) seal plugs
to the holes that you are not using. For example, if you are
using the holes in the back of the box, move the plugs to
cover the holes in the bottom of the box.
3.
Locate studs in the wall and mark the outside edges of the
studs.
4.
Using the wall mount bracket as a template, align the
mounting holes with the center of the studs.
5.
Mark the points on the wall in the center of the holes
where the mounting bolts will be positioned.
6.
Remove the wall mount bracket and drill pilot holes at
each marked point.