
8.2
Procedure
8.2.1
Notes
Commissioning a motor-pump unit requires additional components (drive
controller, control unit).
Basically, commissioning is carried out in two steps:
1. Commissioning of the pump drive (motor control)
2. Commissioning the pump
8.2.2
Commissioning the pump drive (motor control)
See documentation of the component:
Title
Document type
Material number
en (de)
Rexroth Sytronix SvP 7020 IMC, Variable-Speed Pump Drives
Commissioning Manual
R911376149
(R911376148)
Tab. 8-1:
Documentation, motor-pump units
8.2.3
Commissioning the pump
See documentation of the component:
Title
Document type
Material number
en (de)
Rexroth Sytronix SvP 70xx Motor-Pump Unit MPA01
1)
Operating Instructions
R911339824
(R911339822)
1)
This documentation contains references to amending docu‐
mentation for the individual components (motors, pumps, hy‐
draulic fluids, etc.).
Tab. 8-2:
Documentation, motor-pump units
Bosch Rexroth AG
DOK-SYTROX-SVP7020-I*C-IT01-EN-P
56/73
Sytronix SvP 7020 IMC Speed Variable Pump Drives
Commissioning