1 About this Documentation
1.1 Overview – target groups & product phases
The target groups, product phases and activities that can refer to this document
are marked in rounded boxes in the following figure.
Presales Aftersales
Selection
Mounting
(assembly/installation)
Engineering
Commissioning
Operation
Decommissioning
Product
phases
Target
groups
Activities
Design engineer
Programmer
Technologist
Process
specialist
Select
Prepare
Design
Construct
Mechanic/
electrician
Unpack
Mount
Install
Programmer
Commissioning engineer
Parameterize
Program
Configure
Simulate
Technologist
Process specialist
Optimize
Test
Machine
operator
Maintenance
technician
Service
Operate
Maintain
Remove
faults
Create
the NC program
Mechanic/
electrician
Disposal company
Dismount
Dispose
Fig. 1-1: Target groups, product phases and activities
1.2 Intended audience
This document explains technical and service personnel of the machine builder
how to safely install the system housing mechanically and electrically. This
document is not the usage manual.
1.3 Availability
These Instructions are part of the NYS04.2-ST-0x-ULNN-NY40x3 system housing
product delivery (where x = 1, 2, 3, 4, 5) and must always be available for the
user. If the system housing is handed over to another person, these Instructions
must be handed over as well.
NYCe 4000 Multi-axis motion control
system
1/45
About this Documentation
R911337318_Edition 09 Bosch Rexroth AG