
Fig. 12-18: MLC commissioning wizard: Step 2
Enter the IP address of the MLC control to be projected into the section
"Ethernet communication".
To check the connection to the MLC control, click on "Execute" in the
"Connection test" section. The communication between IndraWorks and
the control should then be possible. If no system firmware has yet been
installed on the device, the following note is displayed.
The required firmware can be downloaded later on.
Confirm the dialog with Next>>.
If the connection test fails, check whether the configuration of the
control address and the connection between the project planning
PC and the control are correct.
6. PLC characteristics
Specify the IndraLogic configuration under "Step 3: PLC properties". A
programming template can be selected additionally.
IndraControl VPB 40.4
Bosch Rexroth AG
Device description
DOK-MLC***-INDRACTRLV4-IT02-EN-P
65/87
Summary of Contents for Rexroth IndraControl VPB 40.4
Page 1: ...IndraMotion MLC IndraControl VPB 40 4 Operating Instructions R911383090 Edition 02 ...
Page 88: ...Bosch Rexroth AG IndraControl VPB 40 4 82 87 DOK MLC INDRACTRLV4 IT02 EN P ...
Page 92: ...Bosch Rexroth AG IndraControl VPB 40 4 86 87 DOK MLC INDRACTRLV4 IT02 EN P ...
Page 93: ...Notes IndraControl VPB 40 4 Bosch Rexroth AG ...