3 6 |
Bosch Greenstar
Applications Manual
Bosch Thermotechnology Corp.
Data subject to change
System 6: Setup and Programming
In this single zone system the FW200 is installed in the
living space in a location that represents the conditions
of the entire zone. Avoid locations exposed to direct or
indirect sunlight, heat sources, draft, etc. that can lead to
over compensation.
DHW is generated directly by the combi-boiler without the
need for a storage tank.
Initial setup:
See the installation instructions for description of buttons
and displays, and for details on setup and programming.
Power up the boiler.
When commissioning for the first time set the display
language, date and time.
Upon first commissioning the automatic system
configuration starts. Wait 60 seconds and follow the
instructions displayed. You have the option of using
the factory settings or entering custom parameters to
better match the individual requirements.
Set up the weekly heating program for the three
available temperature levels:
—
Comfort
—
Economy
—
Frost (Frost protection)
Take advantage of using one of the preset programs
from the list or enter a custom program.
—
Program A
—
Program F
—
AM weekday worker
—
PM weekday worker
—
All day
—
All day, lunch
—
Family
—
All day, early shift
—
All day, late shift
—
Seniors
Set the room temperatures for the three specified
temperature levels.
Enter the installer menu to configure the heating zone.
—
Set heating circuit to the type of heat
distribution system used.
—
Set the minimum outdoor temperature, building
storage capacity, design day temperature, and
maximum supply temperature.
—
Set the room influence followed by the
remaining parameters as applicable.
Set up the weekly program for DHW generation.
For additional features of the combi boiler see the
installation manual.
When done, ensure the mode selector is set to AUTO.
The room temperature will be displayed.
Additional information
With outdoor reset the boiler will provide the water
temperature according to the heating curve adjusted by
the level of room in
fl
uence (if enabled).
The boiler will always attempt to run at its highest
efficiency in low fire for as long as necessary.
The boiler will shut down when the target temperature
is reached followed by a 3 minute post purge by the
pump.
The boiler and the pump will start again when the
supply water temperature drops 18°F (10°C) below
the set point.
When the demand for hot water is sensed by the flow
sensor, the boiler will change to DHW mode. When the
DHW demand ends, the boiler will return to heating
mode.
Summary of Contents for Greenstar 100
Page 2: ...2 Bosch Greenstar Applications Manual Bosch Thermotechnology Corp Data subject to change ...
Page 61: ...Applications Manual Bosch Greenstar 61 Bosch Thermotechnology Corp Data subject to change ...
Page 62: ...62 Bosch Greenstar Applications Manual Bosch Thermotechnology Corp Data subject to change ...
Page 63: ...Applications Manual Bosch Greenstar 63 Bosch Thermotechnology Corp Data subject to change ...