COMPRESSOR REPLACEMENT
QV/WQ SERIES
2
8733829556 (2021/07) Subject to change without prior notice
Tools required
•
Flat head screwdriver
•
Utility knife
•
Awl
•
1/2" Socket with long extension
•
Pipe cutter for 3/8" - 7/8" copper
•
Brazing Equipment
Compressor Encapsulation parts
overview are shown on figures 1 & 2
to use later as reference in the
instruction section.
Figure 1. Front encapsulation panels
Figure 2. Side encapsulation panels
Instructions
1)
Turn off power and apply "Lock Out Tag
Out":
a.
Remove line voltage connections and
ensure there is no power supply to the
lines.
2)
Remove front access panel.
Figure 3. Access panel removal
3)
Recover all refrigerant from heat pump
utilizing standard refrigerant recovery
techniques.
4)
Removing Electrical Box
a.
Remove screws holding Electrical Box to
unit base (bottom left) and to unit
corner post (top and bottom side of the
Electrical Box). See Figure 4.
b.
Carefully unplug wire ties and wiring
(Compressor, motor, reversing valve,
high- and low-pressure switch, freeze
and condensate sensors) preventing
from freely moving the electrical box.
NOTE:
Mark wires to facilitate re-wring
later.