![Bosch EHP 6-11 LM User And Installation Manual Download Page 47](http://html.mh-extra.com/html/bosch/ehp-6-11-lm/ehp-6-11-lm_user-and-installation-manual_44188047.webp)
47
FOR THE INS
TALLER
Preparations before connection
Preparations before connection
Moving the heat transfer
fl
uid pipe for
side entry
When the heat pump is supplied the heat transfer fl uid side is assembled
for a top installation. This means the pipes for heat transfer fl uid in and
heat transfer fl uid out run through the top of the heat pump.
If the heat pump is positioned in the house so it is diffi cult to install the heat
transfer fl uid pipes on the heat pump from above, they can be fi tted from the
side (side installation). Both the right- and left-hand sides are prepared for
side installation. The following pages describe side installation.
Side installation should be done before the heat pump is positioned in its
fi nal installation location.
The heat transfer fl uid pipes are
fi tted for top installation when the
heat pump is delivered.
In some situations the heat pump may need extra preparations before it is
commissioned. Such preparations may be:
Moving the heat transfer fl uid pipe for side entry
Supplement the heat pump with a ground water system
Summary of Contents for EHP 6-11 LM
Page 77: ...77 TECHNICAL INFORMATION ...
Page 78: ...78 TECHNICAL INFORMATION ...
Page 79: ...79 TECHNICAL INFORMATION ...