Attaching Monitors:
1. Use appropriate length
screw provided.
2. If monitor has a recessed
mounting surface,
use spacers provided.
S
R
Attaching Face Plates:
1. Attach face plates (O) using
thumb knobs (P) and washers
(Q) as shown. Adjust location of
screens to desired location by
loosening thumb knobs. Re-tighten
when finished.
Dual Xtend 7822J
Assembly Instructions
Table of Parts
REF Part Name
A
Pole Cap (part of
Pole Assembly)
B
VESA Plate
C
Extension Arm Assembly
D
Base Assembly
E
Set Screw
F
Lower Clamp Bracket
G
Clamp Bolt
H
Upper Clamp Bracket
I
Grommet Mount Bolt
J
Joint Cap
K
Height Adjust Arm Cable
Manager
L
Clamp Knob
M
Clamp Pad
N
Fixed Arm Cable Manager
O
Face Plates
P
Thumb Knobs
Q
Washers
R
Spacers
S
Long Screws
T
Clamp Pad Screw
Adjusting the Xtend Arm:
1. With the monitor mounted to the arm, move the monitor through
the height range; Ensure the arm will hold the monitor in the
position you placed it.
2. If the monitor drops
or rebounds upward,
adjust the tension screws
at the front and back of the
arm segment as shown using
the 3/16” Allen key. Repeat steps
until the monitor is counterbalanced.
Adjusting the Joint Torque:
1. Remove joint cap
(J)
from the
top of the joint using a small
flat head screw driver.
2. Holding the bolt in the top
of the joint with a 9/16”
socket, use a second 9/16”
socket on the nut in the
bottom of the joint to
adjust the torque setting.
Adjusting the Tilt Tension
1. If the monitor drops or is too
tight, adjust the tension
screw at the side of the head
as shown using the 3/16”
Allen key.
J
Using the Cable Managers:
1. Remove cable managers
(K & N)
by pinching at
release points.
2. Lay cables in cable managers.
Make sure to leave enough
slack at every joint and base.
3. Snap cable managers
back into place. Note
tex indication “TOP”
inside cable manager.
*
Grommet Mounting:
1. Use Phillips screw driver to remove
the screws which attach the upper
clamp bracket
(H)
to mounting base.
2. Assemble lower clamp bracket
(F)
to
the furthest slots on upper clamp
bracket
(H)
to align clearance holes.
3. Slide knob
(L)
on to long bolt
(I)
.
4. Lay monitor cables through grommet
holes in the work surface.
5. Align base on work surface. Install
bolt
(I)
through the clearance holes
on clamp bracket
(H)
. Insert the
threaded end through the grommet
and into the pole base, using knob
(L)
to tighten securely.
3. Insert monitor cables through cable managers. 4. Mount monitor onto VESA Plate (O).
5. Fine adjustments to the arm (optional).
K
M
T
F
L
G
D
Assembling Dual Xtend
Arm onto base:
1. Align bushing gaps to be
perpendicular with set screw
before tightening.
*Release Points
2. Mount arm assembly (C) to base and
tighten set screw (E) for correct tension,
followed by pole cap (A).
Mounting base to work surface
using the Clamp Mounting
System:
1. Slide knob
(L)
on to short bolt
(G)
,
ensuring the bolt head is securely
engaged into the knob.
2. Screw bolt
(G)
in to the lower clamp
bracket
(F)
and using clamp pad
screw
(O)
attach clamp pad
(M)
to the end of the bolt
(G)
.
3. Hook lower clamp bracket
(F)
in to
one of the top 2 (of the 3) positions
provided.
4. Position clamp bracket and base
(D)
onto work surface in desired location.
5. Using knob
(L)
tighten securely.
1. Mount base assembly (D) to work surface using either the clamp or grommet (see below).
1
H
N7800186_D
E
A
C
K
P
Q
O
D
N
G
M
L
H
P
Q
H
F
2
3
L
I
5
H
I
L