10
Installation - mixer
NOTE: For illustrative purposes
only the 110 tap with cross handles
is shown.
Please follow the same procedure
to install the 210 tap with lever
handles.
Before installing your new mixer,
flush through the pipe work to
ensure removal of debris, turn off
the water supply.
Make sure the O-ring is in place in
the underside of the mixer.
Position the mixer on the bidet.
From the underside of the bidet
screw the two flexible pipes to the
hot and cold connections in the
mixer body, the hot should be to the
left and the cold to the right, hand
tighten only.
Screw the threaded rod into the
small hole to the front of the
mixer body.
Slide the rubber and metal washer
over the rod, the rubber washer
should be on top. Make sure that
raised V part of the rubber washer
sits in the groove of the metal
washer. Screw on the nut and
tighten to clamp the mixer to
the bidet.
CAUTION:
Do not over tighten the
nut as this may damage the bidet.
Connect the water supply to the
inlet pipes. The hot water should be
connected to the left pipe and cold
to the right.
CAUTION:
When
installing the
flexible hoses
do
not
kink, or bend
them more than
the 60mm diameter
as shown right.
60mm
Control
handles
O-ring
Rubber
washer
Metal
washer
Nut
Hot flexible
pipe (red)
Cold flexible
pipe (blue)
Threaded
rod
11
Installation - Pop-up waste
Vertical
control
rod
Vertical
control rod
extension
Horizontal
control rod
Ball joint
retainer
Bearing
Control
rod link
Plug
Plug
housing
Seal
Seal
Body
Dissemble the pop-up waste and
reassemble onto the bidet .
Insert the vertical control rod down
through the hole in the back of
the spout body and screw into the
extension rod.
Place the short end of the horizontal
control Slide the bearing over
control rod making surethat the
camfer is against the ball, Screw on
the ball joint retainer. Do not over
tighten.
Slide the control rod link onto the
vertical and horizontal control rods
and loosely tighten.
Test the action of the pop-up waste
and fully tighten the rod link. Adjust
the control rod link as required.
Adjust the height of the plug as
required.
Turn on the water supply and turn
the mixer on fully to flush through
any possible debris from the mixer.
Finally check all new connections
for leaks.