background image

8

9

Installation - handles

For illustrative purposes only the cross 
handle is shown. 
The same procedure applies to install 
the lever handle.

Cross

Lever

Fig. 2

Fig. 1

The handles can be fitted before or after the main installation. For illustrative 

purposes only the handles are being fitted before the tap installation.

Please follow the same procedure to fit the handles after the tap has been installed.

Installing the handles 

Remove cover nut and valve from the tap 

body, and then remove the lock nut from 

the valve. They should only be hand tight.  

See Fig. 1

Screw the valve back into the tap body. 

Place a handle onto splines and using 

light force only turn the handle clockwise 

until you feel a noticeable resistance 

when the base of valve touches down on 

the body of the tap.
Turn the handle so the valve is in the 

closed position, then remove the handle 

and refit back onto the spline so it is as 

square as possible (do not worry if it is not 

perfectly aligned at this stage).
Without forcing the handle, adjust the 

handle and the valve together so that the 

handle is perfectly straight making sure 

you do not unscrew the valve by more than 

20°. Should you do so you will need to go 

back to the beginning of this section and 

start again.
Test the action of the handle and valve 

making sure that the handle is perfectly 

straight in the off position. 

Remove the handle. 

See Fig. 2

Lever handle 

The lever on the handle should point 

forwards when in the off position.

Valve

splines

Valve

Tap body

Tap body

Handle

Lock nut

Cover nut

Installation - handle

Place the lock nut over the valve and 

screw down. Use a torque wrench to 

tighten the nut down to 20Nm. 

See Fig. 3 

Screw the cover nut onto the valve, hand 

tight only.
Carefully slide the handle onto the splines 

of the valve with the handle pointing in the 

correct position.  

See Fig. 4

Finally secure the handle in position. 

Place the lock washer onto the screw and 

down through the handle, tighten using a 

cross head screwdriver.
Push on the handle cover.

  

See Fig. 5

Fig. 4

Fig. 5

Fig. 3

Handle

Handle

Handle 

cover

Spring 

washer

Screw

Cover nut

Valve

Lock nut

Lock 

washer

Summary of Contents for AXBRIDGE BC-AXB-110-CP

Page 1: ... AXB 210 BN INSTALLATION GUIDE This instruction booklet covers model BC AXB 110 CP BC AXB 110 BN BC AXB 210 CP BC AXB 210 BN Version 1 1 5 19 VADO Wedmore Road Cheddar Somerset England BS27 3EB tel 01934 744466 fax 01934 744345 www vado com sales vado com ...

Page 2: ...elaws 2004 For further information contact the Water Regulations department of your local water supplier see the WRAS website www wras co uk for details or the Water Regulations Advisory Scheme by email info wras co uk or telephone 01495848454 Before making any inlet pipe connections all supply pipes MUST be thoroughly flushed to remove debris Failure to do so could result in damage or low flow fr...

Page 3: ...g washer lock washer screw and screw cover Lever handles with spring washer lock washer screw and screw cover Cross handle option OR Lever handle option Dimensions 178mm 147mm 56mm 112mm 288mm 62mm 55mm Handle dimensions 100mm Lever handle Cross handle ...

Page 4: ... 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 Installation Quick guide 1 2 3 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 3 5 6 4 1 60mm 2 ...

Page 5: ...ly aligned at this stage Without forcing the handle adjust the handle and the valve together so that the handle is perfectly straight making sure you do not unscrew the valve by more than 20 Should you do so you will need to go back to the beginning of this section and start again Test the action of the handle and valve making sure that the handle is perfectly straight in the off position Remove t...

Page 6: ...e connected to the left pipe and cold to the right CAUTION When installing the flexible hoses do not kink or bend them more than the 60mm diameter as shown right 60mm Control handles O ring Rubber washer Metal washer Nut Hot flexible pipe red Cold flexible pipe blue Threaded rod 11 Installation Pop up waste Vertical control rod Vertical control rod extension Horizontal control rod Ball joint retai...

Reviews: