![Bomag BW 177 D-4 Operating Instructions Manual Download Page 64](http://html1.mh-extra.com/html/bomag/bw-177-d-4/bw-177-d-4_operating-instructions-manual_2785494064.webp)
Operation
BOMAG
64
BW 177 D-4
Fig. 99
l
When the end of the track, mark 2, is reached,
press the button F6 “STOP” (Fig. 99).
l
Stop the machine.
Note
i
The first forward pass is finished.
Control field F5 lights green. This means, that the
compaction is not yet completed. One or several
passes are still required.
5.17 Finishing compaction of a
track
Fig. 100
l
Drive forward and reverse passes on a track
until the green control field to the left of F5 (Fig.
100) goes out and the red control field F6 be-
low lights up after pressing the stop button F6.
The compaction process on this track is finished.
Criterion for a finished track:
Compared with the previous track the increase of
the E
VIB
-value in the same travel direction was
less than 10%. This criterion is also fulfiled if the
E
VIB
decreases.
Note
i
Another pass on this track does not make any
sense, because an increase in load bearing ca-
pacity is hardly possible with this machine.
l
If necessary print out the measuring data for
this track (see following section).
Summary of Contents for BW 177 D-4
Page 2: ......
Page 8: ...Table of Contents BOMAG 8 BW 177 D 4...
Page 9: ...BOMAG 9 BW 177 D 4 2 Technical Data...
Page 13: ...BOMAG 13 BW 177 D 4 3 Safety regulations...
Page 24: ...Safety regulations BOMAG 24 BW 177 D 4...
Page 25: ...BOMAG 25 BW 177 D 4 4 Indicators and Controls...
Page 26: ...Indicators and Controls BOMAG 26 BW 177 D 4 Fig 12...
Page 41: ...Indicators and Controls BOMAG 41 BW 177 D 4 4 5 Line diagram1 EVIB Fig 44 1 only BTM prof...
Page 44: ...Indicators and Controls BOMAG 44 BW 177 D 4...
Page 45: ...BOMAG 45 BW 177 D 4 5 Operation...
Page 72: ...Operation BOMAG 72 BW 177 D 4...
Page 73: ...BOMAG 73 BW 177 D 4 6 Maintenance...
Page 86: ...Every 10 operating hours BOMAG 86 BW 177 D 4...
Page 94: ...Every 250 operating hours BOMAG 94 BW 177 D 4...
Page 106: ...Every 500 operating hours BOMAG 106 BW 177 D 4...
Page 114: ...Every 1000 operating hours BOMAG 114 BW 177 D 4...
Page 118: ...Every 2000 operating hours BOMAG 118 BW 177 D 4...
Page 120: ...Every 3000 operating hours BOMAG 120 BW 177 D 4...
Page 122: ...Every 5000 operating hours BOMAG 122 BW 177 D 4...
Page 130: ...As required BOMAG 130 BW 177 D 4...
Page 131: ...BOMAG 131 BW 177 D 4 7 Trouble shooting...
Page 136: ...Trouble shooting BOMAG 136 BW 177 D 4...
Page 137: ...BOMAG 137 BW 177 D 4 8 Cab assembly before initial start up...
Page 147: ...BOMAG 147 BW 177 D 4 9 Disposal...
Page 149: ......
Page 150: ......