We wish to make explicitly clear that we have
not tested or approved any parts or accesso-
ries not supplied by us.
The installation and/or use of such products
may have an adverse effect on the active
and/or passive safety.
3.3.4
Damage, defects, misuse of safety devices
Machines which are not safe to operate or in
traffic must be immediately taken out of service
and shall not be used, until these deficiencies
have been properly rectified.
Safety installations and switches must neither
be removed nor must they be made ineffective.
3.3.5
Roll Over Protective Structure (ROPS)
The frame of the machine must not be warped,
bent or cracked in the area of the ROPS fas-
tening.
The ROPS must not show any rust, damage,
hairline cracks or open fractures.
The real machine weight must never exceed
the testing weight for the ROPS.
No accessories may be welded or bolted on
and no additional holes must be drilled without
the consent of the manufacturer, since this will
impair the strength of the unit.
The ROPS must therefore also not be straight-
ened or repaired if it is damaged.
A defect ROPS must generally be replaced
with an original spare part in close coordination
with the manufacturer.
Concerning your safety – Fundamentals for safe operation
BW 100 AD-5
28
Summary of Contents for BW 100 AD-5
Page 2: ...2 ...
Page 9: ...1 Introduction Introduction BW 100 AD 5 9 ...
Page 13: ...2 Technical data Technical data BW 100 AD 5 13 ...
Page 19: ...3 Concerning your safety Concerning your safety BW 100 AD 5 19 ...
Page 64: ...Concerning your safety Signage BW 100 AD 5 64 ...
Page 65: ...4 Indicators and control elements Indicators and control elements BW 100 AD 5 65 ...
Page 81: ...5 Checks prior to start up Checks prior to start up BW 100 AD 5 81 ...
Page 96: ...Checks prior to start up Checking the hydraulic oil filter BW 100 AD 5 96 ...
Page 97: ...6 Operation Operation BW 100 AD 5 97 ...
Page 122: ...1 Plug Y04 Operation Emergency procedures BW 100 AD 5 122 ...
Page 123: ...7 Loading transporting the machine Loading transporting the machine BW 100 AD 5 123 ...
Page 134: ...Loading transporting the machine After transport BW 100 AD 5 134 ...
Page 135: ...8 Maintenance Maintenance BW 100 AD 5 135 ...
Page 188: ...Maintenance As required BW 100 AD 5 188 ...
Page 189: ...9 Setting up refitting Setting up refitting BW 100 AD 5 189 ...
Page 197: ...10 Troubleshooting Troubleshooting BW 100 AD 5 197 ...
Page 208: ...Troubleshooting Trouble shooting ECONOMIZER BW 100 AD 5 208 ...
Page 209: ...11 Disposal Disposal BW 100 AD 5 209 ...
Page 211: ......