background image

BOH-PM-13-2 

 

 

 

 

 

 

 

© 2016 BOH Environmental LLC 

Chapter 2 Rev. 0.01  

 
 
 
 
 
 
 
 
 

FPU

®

 SYSTEMS OPERATION MANUAL 

 

BOH OFFICE MODULE 

(INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) 

BOH FPU Field Pack-up Units 

 
 
 
 
 
 
 
 
 
 

CHAPTER 2 

 

OPERATOR INSTRUCTIONS 

 
 
 

Summary of Contents for FPU-20-1

Page 1: ...PM 13 2 2016 BOH Environmental LLC Chapter 2 Rev 0 01 FPU SYSTEMS OPERATION MANUAL BOH OFFICE MODULE INCLUDING REPAIR PARTS SPECIAL TOOL LIST BOH FPU Field Pack up Units CHAPTER 2 OPERATOR INSTRUCTIO...

Page 2: ...BOH PM 13 2 Chapter 2 Rev 0 01 This page was intentionally left blank...

Page 3: ...loading of the module on FPU containers transport vehicles and site locations The office module must be loaded into the FPU container using the rear fork pockets 1 with the door facing out the side of...

Page 4: ...ing this operation Overhead power lines and obstructions can cause serious injury or damage to property Forklift operators truck drivers and ground guides should always clear overhead when loading unl...

Page 5: ...They may also be secured within the FPU 8 4 and FPU 20 3 by first inserting removable cradles to the floor of the containers in order to provide the foot pads 1 and locking arms 2 CAUTION Verify that...

Page 6: ...level site to stabilize the module and permit a level working environment 1 Inspect the site and remove rocks roots and debris that would prevent the module from being placed on a firm level site 2 L...

Page 7: ...er door is hinged to the roof section and overlaps the front of the lower door which is hinged to the lower main body of the office module The upper door is lockable with a separate set of keys 1 as t...

Page 8: ...r of the two and includes a two point lock system and separate set of keys 1 The top lock can be unlocked from the inside simply be pulling the handle The bottom lock acts as a deadbolt lock 2 and can...

Page 9: ...available as evidenced by the different hole adjustments available on the roof elevating lock assembly 5 1 The 1 st and shortest position 1 is the most compact option and requires the least amount of...

Page 10: ...ntainer should the customer desire this height Internal Ceiling Height 74 WARNING Should the customer use the office module unit within an FPU container both sides of the container shall remain open a...

Page 11: ...nsported to its deployed location Jack Assembly Storage The office module provides designated storage locations for the jack assembly within the module The jack base assembly 1 is stored along with th...

Page 12: ...nob 3 that secure to the main subassembly by locking into two designated holes 4 in the side of the subassembly The subassembly can be removed from these brackets by a simple pull and twist of the kno...

Page 13: ...ent which may interfere with the jack operation 2 Position the jack base on the floor directly beneath the yellow and black sticker on the ceiling which reads PLACE JACK HERE 3 Insert the hat assembly...

Page 14: ...tion Failure to comply could result in damage to equipment injury or death 9 Pull the lanyard pins from the side of the roof elevating lock assemblies 10 Pull and twist the spring loaded knobs from th...

Page 15: ...e jack can commence To properly retract the jack assembly first move the bottom lever 1 to the down position Then begin cranking the jack handle 2 until the hat assembly is no longer secured against t...

Page 16: ...no longer visible See Raising procedure for crank operation 4 Twist the knobs on the lock assemblies to unlock which will allow the knob to press against the internal post and act as a failsafe 5 Pro...

Page 17: ...MODULE INCLUDING REPAIR PARTS SPECIAL TOOL LIST BOH FPU Field Pack up Units ELECTRICAL SYSTEM Electrical and Communications Connections The Office Module is provided with a communication connection b...

Page 18: ...urce 3 Insert angle plug cord yellow end into office module 4 Connect the white end of the cord to the power source extension cord likely required 5 Turn on the main power source Then turn on all offi...

Page 19: ...0010 00 BOH PM 13 2 Chapter 2 Rev 0 01 0010 00 3 Electrical Wiring Diagram...

Page 20: ...connection side of the communication box is pre run for Cat 3 and Cat 5 through raceways 5 to designated user connection plugs Dual Cat 5 plugs 6 are located above the upper shelf and dual Cat 3 plug...

Page 21: ...or powers the lights The lights are controlled by a 3 way light switch 3 located to the right of the door The 3 settings on the switch include the lower Switch Override setting Off setting and upper S...

Page 22: ...into the extended position first detach the vinyl cover 1 on the rear exterior of the office module CAUTION The HVAC unit must be extended in the out position before operating 2 Push the HVAC evenly f...

Page 23: ...when attempting to push out 3 Once the unit is fully extended attach the velcro covers 1 together with the top cover overlapping the two side covers 4 Plug the HVAC into the designated electrical out...

Page 24: ...h slides simultaneously to begin pushing the HVAC unit into its retracted position 4 Once the HVAC unit is fully retracted lift up the top cover overlap the two side covers and velcro them together Th...

Page 25: ...Pack up Units OPERATION OF INTERNAL COMPONENTS The internal components provided within the office module are designed for 2 person office use These components include a general storage cabinet 2 draw...

Page 26: ...ge or injury CAUTION Do not operate the ratchet handle 1 until all the slack is taken up by hand or the strap will ball up and jam against the release lever Do not over tighten the straps this will ca...

Page 27: ...will click back into place once the door is securely closed The jack assembly storage sleeve 7 is riveted to the side of the cabinet File Cabinet The file cabinet 7 is a 2 drawer system located below...

Page 28: ...BOH PM 13 2 Chapter 2 Rev 0 01 This page was intentionally left blank...

Page 29: ...y blackout conditions Operation in Rain and or Mud 1 Provide an adequate drainage ditch to prevent standing water around the Office Module 2 Secure the office module during extremely harsh rain Operat...

Page 30: ...BC Decontamination Procedures WARNING The Office Module is NOT designed to be operated in contaminated NBC Environments Do not operate the module in contaminated NBC environments If possible cease ope...

Reviews: