32
XLT TS Series Service Manual
The belt is ready to be re-connected at the splice joint. The process for this connection is
simply the reverse of the process described earlier during disassembly. Once the belt has
been spliced, check the alignment of the power and idler sprockets for proper engagement
as shown.
Tension the belt and replace the four (4) screws removed earlier from the idler/tension
shaft blocks.
Check the conveyor belt for free
movement.