background image

STEP  1    Base  Frame  Assembly

4

0

1/4

1/2

3/4

1/4

1/2

3/4

1/4

1/2

3/4

1/4

1/2

3/4

1"

2"

3"

4"

1/4

1/2

3/4

1/4

1/2

3/4

5"

6"

(inch)

To ease the assembly process, Do Not tighten bolts until instructed.

Remember to keep all BOLTS loose to ensure the holes will align easily.

You need two people to help you assemble the Power Tower.

1.Attach Upright Support Frame (3) to Base Frame (1) using four 3/8" spring  Washers (28)

   and four 3/8"Nuts (31). Attach Left Upright (2L) to Base Frame (1) using four 3/8" spring 

   Washers (28) and four 3/8" Cap Nuts(31).

2. Attach Upright Support Frame (3) to Left Upright (2L) using two 1/2" spring Washers (27)

    and two 1/2" X 4 1/4" Bolts (20).

Please proceed the same procedure to the Right Upright (2R) and Base Frame(1).

28

31

28

20

31

27

20

3

1

1

2R

2L

27

20

27

31

28

30

31

31

28

28

31

28

3

20

27

31

28

28

27

30

31

Summary of Contents for PTG1

Page 1: ...Power Tower OWNER S MANUAL MB1121 Recreation Supply Inc Model No PTG1 P O BOX 181 BODYCRAFT is a division of Recreation Supply Sunbury OH 43074...

Page 2: ...recommend warm soapy water Do not use harsh or abrasive chemicals 3 Inspect and tighten all parts before every use Replace any worn parts immediately Failure to do so may result in serious injury 4 K...

Page 3: ...1 27 27 21 26 22 20 27 20 27 3 1 12 31 28 11 30 20 27 31 31 28 28 27 20 27 32 19 36 37 38 34 15 35 27 20 27 20 27 31 27 3 31 28 11 13 36 37 38 2R 34 16 30 27 23 4 27 21 27 21 26 19 32 22 19 2R 28 28 3...

Page 4: ...M CAP PRE ASSEMBLED 3 ROUND CAP PRE ASSEMBLED 1 2 CAP PRE ASSEMBLED 1 2 x 4 1 4 HEX BOLT 1 2 x 4 HEX BOLT PRE ASSEMBLED 1 2 x 3 1 2 HEX BOLT PRE ASSEMBLED 5 16 X 1 1 4 SUNKEN HEAD SCREW PRE ASSEMBLED...

Page 5: ...the Power Tower 1 Attach Upright Support Frame 3 to Base Frame 1 using four 3 8 spring Washers 28 and four 3 8 Nuts 31 Attach Left Upright 2L to Base Frame 1 using four 3 8 spring Washers 28 and four...

Page 6: ...o 1 2 X 4 1 4 Bolts 20 for top holes that screw welded inside the Connector Frame 5 Also using four Spring Washers 27 and two 1 2 X 4 1 4 Bolts for the lower holes 3 Attach Ball Holder 6 to the two Up...

Page 7: ...P 3 Attach Accessories 6 0 1 4 1 2 3 4 1 4 1 2 3 4 1 4 1 2 3 4 1 4 1 2 3 4 1 2 3 4 1 4 1 2 3 4 1 4 1 2 3 4 5 6 inch 35 34 15 9 2R 36 Please attach all accessories according to the Power Tower as drawi...

Page 8: ...manner Failure to do so could result in serious injury or death 4 Exercise with care to avoid injury 5 If unsure about the proper use of the POWER TOWER training system call your local dealer or our...

Reviews: