P3
P4
P7
P6
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
STEP 4
Assemble Cable and Pulleys
8
P1
P9
P2
P3
P4
P6
P8
P7
51
P2
P1
69
36
36
53
63
36
63
36
69
69
63
63
6R
36
53
69
15R
18
71
69
1R
53
36
Cable (27)
Ball End
Bolt End
Bolt Holder
Simultaneously install Cables and Pulleys.
Jam
Nut 1/2
Jam
Nut 2/2
Fig. B
Fig. A
Fig. C
Fig. D
Fig. E
1. Feed the
Bolt End
of
Cable (27)
through
Rotating Pulley Holder (17)
Fig A
. Route over
the two
Pulleys P3
and
P4
mounted on the
Right Top Frame (6R)
Fig B
. Route down and
around the
Pulley Block (18) Pulley P5
Fig C
.
2. Route the cable up and over
Pulleys P6
and
P7
in
Right Top Frame (6R)
Fig B
, then
down and around
Pulley P8
on the
Right Base Frame Leg (1R)
Fig D
. Then up to
threaded
Bolt Holder
welded onto the
Right Pulley Height Adjuster (15R)
Fig E
.
NOTE: The Bolt must installed a minimum of 1/3 of the way into Bolt Holder.
3.
REPEAT
procedure for the Left side.
4.
Tension Cables
by adjusting bolts in
Pulley Height Adjusters (15R,16L)
Fig E
. If you
still have slack, adjust
Pulley Block (18)
into
Selector Rod (20)
Fig C
, and then re-adjust
Cable Bolt in
Pulley Height Adjusters (15R,16L)
.
TIGHTEN ALL Jam Nuts
located at
Bolt Holder
Fig E
and
Pulley Block (18)
Fig C
until bolts are unable to turn.