17
STEP 8 AB CRUNCH CABLE INSTALLMENT
A5
A4
A3
AB CRUNCH CABLE (83)
REMOVABLE END (83A)
Bolt-end
100
147
83A 83
140
3
A1
A2
4
100
134
170
23
T8
101
170
134
19
24
100
134
170
1. See Fig. A1 Screw the
Bolt-end
of the
AB CRUNCH CABLE (83)
at least one-third of the way
into the threaded receptor welded to the
TOP FRAME (4).
This
Bolt-end
is an adjustment
point if needed once all of the cables have been installed.
Be sure to tighten the Jam-nut.
2. See Fig. A2 Install one
4-1/2" PULLEY (100)
into
SINGLE PULLEY BLOCK (24)
using one
3/8" X 1-3/4" HEX BOLT (134)
and one
3/8" NYLA-NUT (170)
.
Tighten
. Route the cable
down to
Pulley A2
.
3. See Fig. A3 Install one
4-1/2" PULLEY (100)
into the second hole up of
ADJ. PULLEY
BLOCK (23)
and secure with one
3/8" X 1-3/4" HEX BOLT (134)
and one
3/8" NYLA-NUT
(170)
.
Tighten
. Continue routing the cable up to the
Pulley A3
.
4. See Fig. A4 Install one
3-1/2" PULLEY (101)
into the
CABLE ARM CONNECTOR (19)
, using
one
3/8" X 1-3/4" HEX BOLT (134)
and one
3/8" NYLA-NUT (170)
.
Tighten
. Continue
routing the cable down to the
Pulley A4
.
5. See Fig. A5 Install one
4-1/2" PULLEY (100)
into the
FRONT UPRIGHT (3)
, using one
3/8" X
109.5L FLAT PIN BOLT (140)
and one
M6 X 12L MALE SCREW (147)
.
Tighten
. Continue
routing the cable up to and over the top of
Pulley A5
.
Install
REMOVABLE END (83A)
at
A5
.
IMPORTANT!
Make sure it is completely tightened!
Fig. A3
Fig. A4
Fig. A5
Fig. A2
Fig. A1