![BodyCraft BCG-GX Instruction Manual Download Page 14](http://html1.mh-extra.com/html/bodycraft/bcg-gx/bcg-gx_instruction-manual_2783159014.webp)
13
STEP 7 INSTALL AB CABLE
1. Run the steel ball end of the Ab Cable (88) through the slot in the Front Upright (3) and attach two pulleys in the
slot as shown in Fig. A1, using two 3/8" X 3" Hex Bolts (99), four 3/8" Washers (116), four 3/8" ID Bushings (77),
and two 3/8" Nylon Nuts (124). The cable should run from the bottom of the upper pulley in A1 up to the Pulley
A2.
2. Route the cable over the Pulley A2 mounted to the Top Frame (2) using one 3/8" X 1-3/4" Hex Bolt (101) and
one 3/8" Nylon Nut (124).
3. Then route the cable under Pulley A3 mounted in a Double Pulley Block (19) using one 3/8" X 1-3/4" Hex Bolt
(101) and one 3/8" Nylon Nut (124).
4. Continue routing the cable up and over Pulley A4 mounted in Top Frame (2) using assembled one 3/8" X 2-3/4"
Hex Bolt (100) as T7, one 3/8" Nylon Nut (124), and Pulley Guide Bracket (32).
5. Then route the cable under Pulley A5 mounted in a Double Pulley Block (19) using one 3/8" X 1-3/4" Hex Bolt
(101) and one 3/8" Nylon Nut (124).
6. Mount a pulley in the open end of the Adjustable Pulley Block (18) using one 3/8" X 1-3/4" Hex Bolt (101) and
one 3/8" Nylon Nut (124). We recommend the third from bottom hole. This can be adjusted later if needed.
Route the cable over top of this pulley and then down to c.
Summary of Contents for BCG-GX
Page 3: ......
Page 13: ...12 STEP 6 INSTALL TOP CABLE ...