LPT
23
4.3
Maintenance and Inspection Calendar
To avoid damage from body sweat, the equipment must be cleaned with a damp towel (no solvents!)
after each training session.
The following routine tasks must be performed at the specified intervals:
Part
Weekly
Monthly
Quarterly
Half-yearly
Yearly
Cables and pulleys
C/I
Bolt connections
I
Pulleys and cables
I
C = clean; I = inspect
5
DISPOSAL
At the end of its operational life, this equipment cannot be disposed of in normal household waste.
Instead, it must be disposed of via an electricals recycling centre. Further information can be
obtained from your local authority‘s recycling service.
The materials can be recycled as per their symbols. Through the reuse, recycling
of materials or other forms of recovery of old equipment, you make an important
contribution to the protection of the environment.
Summary of Contents for BC-LPT
Page 1: ...TF BC LPT 01 02 Lat Pull Tower BC LPT Assembly and Operating Instructions ...
Page 2: ...LPT 2 ...
Page 11: ...11 ...
Page 17: ...17 ...
Page 19: ...19 ...
Page 28: ...LPT 28 7 3 Exploded Drawing ...
Page 33: ...33 Notes ...
Page 34: ...LPT 34 Notes ...
Page 35: ...35 ...
Page 36: ...Lat Pull Tower ...