8
S T E P
1
Be careful to assemble all components
in the sequence they are presented.
NOTE:
Finger tighten all hardware in this step. DO NOT wrench tighten until instructed.
Some components may be pre-assembled. Nylon lock nuts will not fully screw onto
bolts, they must be wrench tightened to fully go on.
1A.
Attach Steel Plates
(F)
to both Base Frames
(A)
using:
8 - (#1) M16x110mm Hex Head Bolt
16 - (#3) M16 Regular O.D. Washer
8 - (#5) M16 Nylon Lock Nut
NOTE #1:
Please refer to the drawing for the correct bolt hole locations.
1B.
Attach Uprights
(B)
to Steel Plates
(F)
using:
8 - (#1) M16x110mm Hex Head Bolt
16 - (#3) M16 Regular O.D. Washer
8 - (#5) M16 Nylon Lock Nut
NOTE #2:
It is recommedated to install the equipment with at least two persons.
Summary of Contents for GPR400
Page 1: ... A s s e m b l y I n s t r u c t i o n s O W N E R S M A N U A L V GPR400 20190813 GPR400 ...
Page 9: ...S T E P 1 Above shows Step 1 assembled and completed 9 Front of Rack Note 1 ...
Page 11: ...S T E P 2 Above shows Step 2 assembled and completed 11 ...
Page 13: ...S T E P 3 Above shows Step 3 assembled and completed 13 ...
Page 14: ...45 14 N o t e s ...