Assembly Instructions

Step 1 

(Preparations)

Remove the lid . Then remove the device 
carrier  from the box . (See page U3)

Step 2

Before pouring the screed, a polystyrene 
block (PB) with a circumference of approx.  
40 mm larger than the box in its outer  
dimension

*

 must be glued to the insulation 

layer (P) as a placeholder. Then lay the 
conduits (L) and fix them (e. g.  with  adhesive 
tape)
 vertically to the polystyrene block (PB).

PB

L

P

40 mm

40 mm

40 mm

40 mm

Floor socket

View from above

PB

Summary of Contents for 8804B

Page 1: ...Zeichnungen des Produkts dienen nur als Referenz und k nnen vom tat s chlichen Produkt abweichen The product drawings shown are for reference only and may differ from the actual product BS Bodensteck...

Page 2: ...r Device carrier Steckdose Socket Geh use Box Art Nr Einbauma e Zuleitungen Nivellierbar Schutzart Belastbarkeit 8804B 220x150x70mm 4x hinten 25mm 5mm IP20 Fl chenlast max 300 kg Item No Instl dimensi...

Page 3: ...Schritt 2 Vor dem Gie en des Estrichs einen Polystyrol Block PB der in seiner u eren Abmessung umlaufend ca 40mm gr er ist als die Dose als Platzhalter auf die ausgelegte D mmschicht P kleben Danach...

Page 4: ...Bodenaussparung auf ein M rtelbett M einsetzen und die Leerrohre in die ffnungen des Geh uses einf hren Achtung Die H he des M rtelbetts M muss so vermessen werden dass die Wasserwaage W und der Estr...

Page 5: ...dichten Tipp die Geh use ffnung oben beispielsweise mit Pappe o abdecken wie abgebildet Die Aussparung um das Geh use nun mit M rtel M auff llen Die Position des Geh uses vor dem Aush rten des M rtels...

Page 6: ...ckdosen anschlie en und den Ger tetr ger wieder in das Geh use einschrauben Danach den Deckel mit Belag B bekleben und einsetzen Den restlichen Belag B im Raum verlegen Die Bodensteckdose ist nun erfo...

Page 7: ...ing the screed a polystyrene block PB with a circumference of approx 40 mm larger than the box in its outer dimension must be glued to the insulation layer P as a placeholder Then lay the conduits L a...

Page 8: ...oor recess on a mortar bed M and install the conduits into the openings of the housing Attention The height of the mortar bed M must be measured so that the spirit level W and screed E are flush align...

Page 9: ...9 Step 4 Seal the box Tip Cover the box opening for example with cardboard as shown Now fill the recess around the box with mortar M Check the position of the box before curing the mortar W M P E...

Page 10: ...t the sockets screw the device carrier back into the housing Glue floor cover into the lid and insert the lid Lay the remaining covering B in the room The floor socket is now successfully installed Se...