Page 33
Cable Routing of the Servo Motor Cables
Preparing the Drag Chain for Wire Routing
Step 1
Slide the Gantry half way along the X axis as shown.
Step 2
Use a crescent wrench for leverage and GENTLY remove the
upper connecting tabs on the Drag Chain as shown to the
point where the chain loops back. Only remove the upper
tabs.
Keep the tabs in a safe place for reinstallation later.
When removing the connecting tabs DO NOT
remove the upper and lower tabs of a single link or
the drag link will separate.
Hint
Summary of Contents for KL744
Page 1: ...Page 1 Version 2 6 Mechanical System KL 744 MANUAL 5 of 8 ...
Page 4: ...Page 4 Part Description Qty Photo H24 Adjustment Tool 1 Vacuum Shoe 1 Vacuum Shoe Retainer ...
Page 29: ...Page 29 NOTE Proper orientation of the Drag Chain ends ...
Page 34: ...Page 34 Step 3 Remove the upper tabs until you reach the bend ...
Page 35: ...Page 35 Leave one tab on the front of the bend Leave three tabs on the back of the bend ...
Page 48: ...Page 48 Step 2 Finish by routing the Y Home Switch wire down and through the Drag Chain ...
Page 57: ...Page 57 Properly tightened belt with teeth fully engaged beneath the Idler Pulleys ...
Page 62: ...Page 62 Plug the Router into the Extension Cord as shown Step 4 ...
Page 67: ...Page 67 Lock the Brush Shoe Assembly in place by inserting the Shoe Retainer as shown Step 4 ...