Page 12
Step 1
The bolt and nut
must be positioned
on the top of the
support.
Thread a 5/16 Nut onto the 5/16
-
18 x 1 Hex Head
Bolt as shown and insert it in the Rail Support as
shown.
NOTE: In this step thread the nut until it touches the
head of the bold. This bolt will be used to tighten
the Y axis belt in a later step.
Installing the Y Servo Motor to the Y Carriage
Summary of Contents for KL744
Page 1: ...Page 1 Version 2 6 Mechanical System KL 744 MANUAL 5 of 8 ...
Page 4: ...Page 4 Part Description Qty Photo H24 Adjustment Tool 1 Vacuum Shoe 1 Vacuum Shoe Retainer ...
Page 29: ...Page 29 NOTE Proper orientation of the Drag Chain ends ...
Page 34: ...Page 34 Step 3 Remove the upper tabs until you reach the bend ...
Page 35: ...Page 35 Leave one tab on the front of the bend Leave three tabs on the back of the bend ...
Page 48: ...Page 48 Step 2 Finish by routing the Y Home Switch wire down and through the Drag Chain ...
Page 57: ...Page 57 Properly tightened belt with teeth fully engaged beneath the Idler Pulleys ...
Page 62: ...Page 62 Plug the Router into the Extension Cord as shown Step 4 ...
Page 67: ...Page 67 Lock the Brush Shoe Assembly in place by inserting the Shoe Retainer as shown Step 4 ...