
22
OPERATION
NOTE
:
Follow all procedures precisely to ensure initialization & operation.
Initialization
1.
Power the TCII on by switching the System Power to the ON position. The green indicator light to the
right of the power switch will turn on immediately.
2.
The TCII will immediately go into a diagnostics/test mode and will take about 20 seconds to initialize
before the display is activated.
3.
Once the internal systems check out, the TCII will display the HOME Screen.
Figure 12 The HOME Menu
This Page Intentionally Left Blank
Summary of Contents for Truck-Coder II
Page 2: ...This Page Intentionally Left Blank ...
Page 4: ...ii This Page Intentionally Left Blank ...
Page 16: ...8 This Page Intentionally Left Blank ...
Page 18: ...10 This Page Intentionally Left Blank ...
Page 20: ...12 This Page Intentionally Left Blank ...
Page 22: ...14 Figure 5 ODU Footprint ...
Page 24: ...16 This Page Intentionally Left Blank ...
Page 32: ...24 ...
Page 34: ...26 This Page Intentionally Left Blank ...
Page 37: ...29 ...
Page 43: ...35 This Page Intentionally Left Blank ...