17
Installation
Unpacking
Remove the two plastic tape and the
internal packing.
Carefully check that the unit has not
been damaged during transport. Any
signs of damage must be reported to the
forwarder immediately.
Ensure that a qualified technician
connects it to the electric supply following
the manufacturer’s instructions and
according to the local safety regulations.
The end user is not permitted to access
the internal service parts of the unit.
Only technical personnel should carry
out operations of this nature.
Siting the unit
Wear safety gloves when handling the
unit. The unit must be handled by two
people.
Site the unit away from sources of heat
and on a flat and strong surface suitable
to support its weight. Do not place on
inclined surfaces.
SANITIZE the machine as described in the
paragraph on page 21.
Drill a ø34mm hole on the chosen surface.
Insert the inlet tubes of the dispensing
head through the dedicated hole and
secure the unit firmly to the counter top
with the 1” hut provided.
Open the cover of the electrical box when
the plug is not inserted and secure the
box with screws on the wall below the tap
at a maximum distance of 55 cm.
Fig. 17.1
Fig. 17.2
* Installation. All of the operations must be carried out
exclusively by qualified technical personnel. To view
the video tutorial, scan the QR code.