MZ18
Accessories & Tools
BLUEVIEW ELEC-OPTIC TECH CO.,LTD
Add: No.1000, Section 2, 2nd Konggang Road, Southwest
Aviation Industrial Development Zone, Chengdu,Sichuan, China.
Zip code: 610207
Tel: +86-28-8148 0011 Fax: +86-28-8148 1258
Mail: [email protected] Web.: www.blueviewled.com
Specifications are subject to change without notice.
Blueview™ 2018– All rights reserved. Made in China.
MZ18
Diagonal pliers
Connection terminal
M3 Self-tapping screw
Electric Drill
Installation steps
Clean the mounting
surface;
Peel away the self
adhesive tape on the
rear of led modules;
Evenly arrange the
l e d m o d u l e s w i t h
appropriately space.
Pay attention to the
c o r n e r o f t h e l i g h t
box
If the modules need to
be connected, please
connect rmly. The
thread should have
insulation,waterproof
and anti-corrosive
treatment
;
Check the line to
ensure correct
connection, then
power on for self-
test. Fix the led
modules with screws
if no problem.
Attentions in installation
Load voltage, current, power and power supply should be matched with the product.
Follow the instructions of wiring diagram (rst connect the load and then the power supply) to avoid
short circuit.
Make sure the correct connection of positive and negative poles between led module and power
supply. Otherwise, the light will not be on.
Make sure the power cord rmly screwed into the terminal and it should not be pulled out by hands.
The terminal should have insulation,waterproof and anti-corrosive treatment.