
2. Install the indoor air handler
Indoor Unit
Installation
●
After you selecting an installation location, drill
a hole with the diameter of 6mm or less into
the roof beam based on the layout of the
installation board (accessory
Installation
cardboard template
). After drilling the hole,
remove the installation board.
NOTICE
NOTICE
After you have finished installing the main body,
when choosing where to start, determine the
direction of the pipes to be drawn out.
Especially in cases where there is a ceiling involved,
align the refrigerant pipes, drain pipes, and indoor
and outdoor lines with their connection points
before mounting the unit.
Page 24
Installation cardboard template
●
Connect the wire to the terminal according to
the wire connecting diagram.
Select one to
connect ground
wire
●
Fix the wire with the clip by using the two screws.
●
Install the terminal cover by fixing the two screws.
Two screws
1
2
3
TO OUTDOOR UNIT
TO INDOOR UNIT MAIN BOARD
430mm
(
16.93’’
)
1300mm
(
51.18’’)
CUTTING LINE
Summary of Contents for BMHH18M22-6C2-6C2
Page 27: ...outdoor Unit Installation Page 27 Outdoor Unit Installation...
Page 28: ...outdoor Unit Installation Page 28...
Page 29: ...outdoor Unit Installation Page 29...
Page 33: ...Refrigerant piping Connection Page 33...
Page 34: ...Refrigerant piping Connection Page 34...
Page 36: ...Refrigerant piping Connection Page 36 Electrical Connections...
Page 37: ...Refrigerant piping Connection Page 37...
Page 38: ...Page 38 Refrigerant piping Connection...
Page 39: ...Page 39...