background image

902-290 6’ Sectional Slide

GENERAL USE/FALL ZONE & FOOTING RECOMMENDATIONS 
 

Stationary & Portable equipment – Use/Fall zones should extend a minimum of 6 
feet in all directions from the perimeter of the equipment ground space.  
This area should be covered with the required amount of resilient safety 
surfacing material.   
 
For some equipment – Use/Fall zones can overlap.  See Consumer Product Safety 
Commission Guidelines.  Diameter and depth of footings illustrated are 
satisfactory in most applications for pipe sizes up to 2 3/8” diameter.  
Varying soil & climatic conditions may require deeper and heavier footings in 
some areas.  Check local building codes. 
 
 

 

IF RESILIENT SURFACING IS TO BE LESS THAN 12”, THEN ADDITIONAL PIPE SHOULD BE 
PUT IN CONCRETE TO MAINTAIN PROPER FINISH GRADE FOR EQUIPMENT. 

 
 
 
 
 
 
 
 

 
 
USE AREA AND FOOTING LAYOUT:   
 
(see page 1) 
 
 
 
GENERAL ASSEMBLY INSTRUCTIONS: 
 

Check all the parts and hardware with the packing list to be sure you have 
received everything needed to assemble this product.  CONTACT YOUR LOCAL 
DISTRIBUTOR with notification of any missing or damaged parts.  Contact MUST 
be made within ten days of receipt of your order.  Only hand-tighten nuts & 
bolts on initial assembly.  Final tightening should be done EVENLY after 

nal assembly when unit has been plumbed & leveled.  

fi

 
GENERAL MAINTENANCE INSTRUCTIONS: 

 
Check MONTHLY for loose bolts, damaged or broken parts. 
 

ASSEMBLY AND INSTALLATION: 

 

NOTE: 
 
 
 
 
 
 

All threaded ends of bolts protruding beyond nuts must be cut off 
and/or peened to eliminate sharp edges.  No more than two threads 
should extend beyond face of nut.  All washers, “T” nuts, and other 
fastener hardware used on round pipe or tubing must be hammered down to 
conform to the curved underlying surface to eliminate catch points. 
DO NOT tighten nuts more than hand-tight until entire assembly is 
completed. 

Summary of Contents for 6' Sectional Slide 902-290

Page 1: ...er all playground equipment Appropriate publications available at no charge from the Consumer Product Safety Commission include A Handbook for Public Playground Safety You can receive your free copy b...

Page 2: ...ING LAYOUT see page 1 GENERAL ASSEMBLY INSTRUCTIONS Check all the parts and hardware with the packing list to be sure you have received everything needed to assemble this product CONTACT YOUR LOCAL DI...

Page 3: ...t Screws Pour Concrete Dome top of cement for proper drainage Wait 48 hours before removing braces applying resilient surfacing and using equipment NOTE Attach warning label and Manufacturer s Identif...

Page 4: ...when post is level Decks attach to deck clamps using X 2 Button Head bolts washer on top and bottom with lock nuts Connect the deck bolt firmly Additional information on deck clamp and deck installat...

Page 5: ...Sectional Slide De Us a 4 level across marks to make sure the tops of the posts are equal to each other If line marks are on bubble then post tops should be on bubble to each other Mark 22 from bottom...

Page 6: ...level the posts Re blocking may be necessary at times in order to achieve level You may also have to widen your holes if they are not dug center sides of your deck top When you go to install th method...

Page 7: ...n the deck clamps Use a level and a marker to make sure the clamps are level to each other Then place deck onto clamps and bolt This method works but is less stable than the first method The deck and...

Page 8: ...your evious work Adjust the post levels carefully not roughly pr When all 4 posts are plumb and stable drill through the deck clamps and into the posts with a metal drill bit Install the roll pins so...

Page 9: ...ted deck and 4 posts Deck and post are vertically and horizontally level and clamps are tight Posts are center to deck corners Roll pins are installed Avoid standing on decks until the addition of mor...

Page 10: ...902 290 6 Sectional Slide Posts must be blocked solidly for a stable ongoing installation Blocks are removed just before concrete is installed...

Page 11: ...for integrity and tightness INSTRUCTIONS The ten rung wall is 48 wide and attached with 4 clamps making sure you have evenly spaced the wall on both sides making sure there is less than 3 between the...

Page 12: ...it over the 15 apart holes on top of deck Mark on ground for the two bottom legs 20 apart Remove ladder and dig two holes 12 wide and 24 deep Connect the bottom leg with 2 1 x 3 8 button head bolt was...