background image

902-290 6’ Sectional Slide

Posts must be blocked solidly for a stable, ongoing installation.  Blocks are 
removed just before concrete is installed. 
 

 

Summary of Contents for 6' Sectional Slide 902-290

Page 1: ...er all playground equipment Appropriate publications available at no charge from the Consumer Product Safety Commission include A Handbook for Public Playground Safety You can receive your free copy b...

Page 2: ...ING LAYOUT see page 1 GENERAL ASSEMBLY INSTRUCTIONS Check all the parts and hardware with the packing list to be sure you have received everything needed to assemble this product CONTACT YOUR LOCAL DI...

Page 3: ...t Screws Pour Concrete Dome top of cement for proper drainage Wait 48 hours before removing braces applying resilient surfacing and using equipment NOTE Attach warning label and Manufacturer s Identif...

Page 4: ...when post is level Decks attach to deck clamps using X 2 Button Head bolts washer on top and bottom with lock nuts Connect the deck bolt firmly Additional information on deck clamp and deck installat...

Page 5: ...Sectional Slide De Us a 4 level across marks to make sure the tops of the posts are equal to each other If line marks are on bubble then post tops should be on bubble to each other Mark 22 from bottom...

Page 6: ...level the posts Re blocking may be necessary at times in order to achieve level You may also have to widen your holes if they are not dug center sides of your deck top When you go to install th method...

Page 7: ...n the deck clamps Use a level and a marker to make sure the clamps are level to each other Then place deck onto clamps and bolt This method works but is less stable than the first method The deck and...

Page 8: ...your evious work Adjust the post levels carefully not roughly pr When all 4 posts are plumb and stable drill through the deck clamps and into the posts with a metal drill bit Install the roll pins so...

Page 9: ...ted deck and 4 posts Deck and post are vertically and horizontally level and clamps are tight Posts are center to deck corners Roll pins are installed Avoid standing on decks until the addition of mor...

Page 10: ...902 290 6 Sectional Slide Posts must be blocked solidly for a stable ongoing installation Blocks are removed just before concrete is installed...

Page 11: ...for integrity and tightness INSTRUCTIONS The ten rung wall is 48 wide and attached with 4 clamps making sure you have evenly spaced the wall on both sides making sure there is less than 3 between the...

Page 12: ...it over the 15 apart holes on top of deck Mark on ground for the two bottom legs 20 apart Remove ladder and dig two holes 12 wide and 24 deep Connect the bottom leg with 2 1 x 3 8 button head bolt was...

Reviews: