background image

902-290 6’ Sectional Slide

IMPORTANT 

 

PLEASE READ THESE INSTRUCTIONS BEFORE COMMENCING ASSEMBLY.  All equipment 
must be installed in accordance with these instructions.  Check your shipment 
against Bill of Lading and Parts list.  Any missing or broken parts must be 
reported to your distributor within 10 days of receipt of your order.  When 
properly installed and maintained, equipment will give many years of Safe, 
Trouble-Free use.  Periodically check for loose or broken parts.  Loose bolts 
must be tightened and broken parts must be replaced as they can possibly 
create dangerous situations leading to unnecessary accidents.  Resilient 
Surfacing should be used under all playground equipment.  Appropriate 
publications, available at no charge, from the Consumer Product Safety 
Commission, include “A Handbook for Public Playground Safety”.  You can 
receive your free copy by calling 1-301-504-7908. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

PACKING LIST HARDWARE 

BAG 

 

Hardware Bag 

2

126-701 

3/8” x 1 ¼” Button Head Bolt 

 

6’ Sectional Slide 

11

126-702 

3/8” x ¾” Button Head Bolt 

12 

903-001 

Pipe Clamp 

2

226-602 

3/8” Nylon Insert Lock Nut 

903-002 

Deck Clamp 

15

316-601 

3/8” Flat Washer 

903-141 

Spiral Slide Z Bracket 

1

805-532 

Warning Label 

903-214 

T Slide Leg 

1

805-534 

SportsPlay Label 

903-286 

Slide Center Support 

1

 

Maintenance Checklist 

903-306 

Arch Entry Panel 

 

 

1 903-324  Step 

Leg 

 

 

2 903-327  Hand 

Rail 

 

 

1 905-710  Triangle 

Deck 

 

 

905-712 

6’ deck steps 

 

 

3 913-112  Post 

12’6” 

 

 

913-115 

Slide Guard 48” 

 

 

913-117 

Ten Rung Wall 

 

 

 
 
 

1 SKID 

1 SLIDE 

2 TOTAL PCS 

953 # Weight   

Class 70 

Summary of Contents for 6' Sectional Slide 902-290

Page 1: ...er all playground equipment Appropriate publications available at no charge from the Consumer Product Safety Commission include A Handbook for Public Playground Safety You can receive your free copy b...

Page 2: ...ING LAYOUT see page 1 GENERAL ASSEMBLY INSTRUCTIONS Check all the parts and hardware with the packing list to be sure you have received everything needed to assemble this product CONTACT YOUR LOCAL DI...

Page 3: ...t Screws Pour Concrete Dome top of cement for proper drainage Wait 48 hours before removing braces applying resilient surfacing and using equipment NOTE Attach warning label and Manufacturer s Identif...

Page 4: ...when post is level Decks attach to deck clamps using X 2 Button Head bolts washer on top and bottom with lock nuts Connect the deck bolt firmly Additional information on deck clamp and deck installat...

Page 5: ...Sectional Slide De Us a 4 level across marks to make sure the tops of the posts are equal to each other If line marks are on bubble then post tops should be on bubble to each other Mark 22 from bottom...

Page 6: ...level the posts Re blocking may be necessary at times in order to achieve level You may also have to widen your holes if they are not dug center sides of your deck top When you go to install th method...

Page 7: ...n the deck clamps Use a level and a marker to make sure the clamps are level to each other Then place deck onto clamps and bolt This method works but is less stable than the first method The deck and...

Page 8: ...your evious work Adjust the post levels carefully not roughly pr When all 4 posts are plumb and stable drill through the deck clamps and into the posts with a metal drill bit Install the roll pins so...

Page 9: ...ted deck and 4 posts Deck and post are vertically and horizontally level and clamps are tight Posts are center to deck corners Roll pins are installed Avoid standing on decks until the addition of mor...

Page 10: ...902 290 6 Sectional Slide Posts must be blocked solidly for a stable ongoing installation Blocks are removed just before concrete is installed...

Page 11: ...for integrity and tightness INSTRUCTIONS The ten rung wall is 48 wide and attached with 4 clamps making sure you have evenly spaced the wall on both sides making sure there is less than 3 between the...

Page 12: ...it over the 15 apart holes on top of deck Mark on ground for the two bottom legs 20 apart Remove ladder and dig two holes 12 wide and 24 deep Connect the bottom leg with 2 1 x 3 8 button head bolt was...

Reviews: