Blue-White industries ProSeries Chem-Feed CFPS-1 Manual Download Page 9

7.0 

Component Identification and Typical Operation - Dual Pump Skid

Connections:

Connect chemical solution into either Inlet 1 or inlet 2. (V-1 or V-2)
Connect chemical treated system to outlet. (V-11)

To Pump chemical solution into system.

Open ball valve V-1 or V-2, depending on your inlet side.
Open ball

 

valve V-3

Close ball valve V-6, V-7, and V-11.
Open ball valve V-4 and / or V5. Depending on your system design.
Open ball valve V-12 to inject chemical solution into your system.
Start pump(s).

To calibrate pump(s) / system.

Open ball valve V-1 or V-2, depending on your inlet side.
Open ball valve V-3.
Open ball valve V-4 or V5, depending on which pump you’re calibrating.
Close ball valve V-6, V-11, and V-12.
Open ball valve V-7. This open valve will direct chemical into calibration cylinder.
Start pump and run until calibration cylinder is filled to top calibration line. Do not leave pump unattended during 
this operation!
Stop pump once calibration cylinder is filled.
Close ball valves V-1, V-2, and V-7.
Open ball valve V-4 or V-5, depending on which pump you’re calibrating.
Open ball valve V-6 and V-12 to inject chemical solution into your system.
Note the chemical solution level in the calibration cylinder.
To calibrate pump at maximum speed into your system, Press the prime button on pump. The prime mode runs the 
pump at maximum speed for 60 seconds (1 minute) on all Blue-White® ProSeries pumps.
To calibrate pump at your desired feed rate, you must pre-program your pump speed before running this routine. 
Please refer to the instruction manual for your pump to adjust feed rate and additional calibration instructions.

7.1  

How To Operate the Chem-Feed®  Skid System - Dual Pump Skid

V3

V4

V5

V6

One way

Check Valves

(with union)

Y Strainer

PRV*

V11

* PRV = Pressure Relief Valve preset at 50psi 

U-2

P

PRV-1

CV-1

U-4

U-5

V-1

V-2

V-6

V-4

V-7

V-9

PD-1

G-1

S6A

V-11

T-1

T-2

Chemical
Inlet 2

Chemical
Inlet 1

Chemical
Outlet

Safety vent
to tank

S-1

CC-1

U-1

V-3

V-10

V-12

U-3

P

CV-1

U-4

U-5

T-1

T-2

V-5

F-1

S-2

V1

V2

V12

V7

V9

Chemical
Output

Chemical

Input #1

Chemical
Input #2

Chemical Feed
Flowmeter

Calibration

Cylinder

V8

Pressure

Gauge

Pulsation
Dampener
(optional)

Y Strainer

V10

V-8

CFS System

Page 9

CFS System

Page 8

Summary of Contents for ProSeries Chem-Feed CFPS-1

Page 1: ...ue white com or techsupport blue white com URL www blue white com ProSeries by Blue White Ind TM CHEM FEED Engineered Skid Systems 2 TWO YEAR WARRANTY ProSeries R R Note Your Chem Feed Engineered Skid System may be designed differently from above photos CFPS 1 Single pump system CFPS 2 Dual pump system ...

Page 2: ...Protects the user from back flow during pump maintenance Ships on all systems Flow Verification Sensor S6A accurately verifies chemical feed Exclusive to Blue White Inlet Y Strainer Protects system components from damage cause by dirt or debris Calibration Cylinder Confirm pump output under system conditions Specify cylinder volumes from 1 6 GPH to 64 GPH Pulsation Dampener Protect the system comp...

Page 3: ...500ml 16 GPH 1000ml 32 GPH 2000ml and 64 GPH 4000mL Pulsation Dampener PD CPVC body 10 cubic inch volume Gauge w guard G Gauge liquid filled stainless steel with blowout plug bottom mount 1 4 NPT theads Available pressure ranges 0 30 psi 0 100 psi 0 200 psi Guard PVC body temperature compensated oil filled Check Valve CV PVC body Cracking pressure 1 0 1 5 psi Maximum working pressure inlet 150 psi...

Page 4: ...System may be designed differently from drawings below However the dimensions shown below remain the same no matter your configuration 30 00in 76 20cm 34 00in 86 36cm 45 37in 115 24cm 118 04cm 46 47in 32 15in 81 65cm 35 00in 88 90cm 49 50in 125 73cm CFS System Page 4 ...

Page 5: ...5 0 Mounting Pump to the Chem Feed System Single and Dual System Socket Head Screw SS 10 32 625 10 washer and 10 32 nut Qty 4 of each per pump Mounting Bracket Qty 2 per pump CFS System Page 5 ...

Page 6: ...essure Relief Valve preset at 50psi Chemical Output Pressure Gauge Chemical Feed Flowmeter One way Check Valve with union Calibration Cylinder Pulse Dampener optional V2 Chemical Input 2 Chemical Input 1 V1 V10 V7 V8 V6 Y Strainer PRV V3 V4 V5 V9 Gauge Guard CFS System Page 6 ...

Page 7: ... pump unattended during this operation Stop pump once calibration cylinder is filled Close ball valves V 1 V 2 and V 6 Open ball valve V 5 and V 10 to inject chemical solution into your system Note the chemical solution level in the calibration cylinder To calibrate pump at maximum speed into your system Press the prime button on pump The prime mode runs the pump at maximum speed for 60 seconds 1 ...

Page 8: ...ne way Check Valves with union Y Strainer PRV V11 PRV Pressure Relief Valve preset at 50psi V1 V2 V12 V7 V9 Chemical Output Chemical Input 1 Chemical Input 2 Chemical Feed Flowmeter Calibration Cylinder V8 Pressure Gauge Pulsation Dampener optional Y Strainer V10 CFS System Page 8 ...

Page 9: ...ded during this operation Stop pump once calibration cylinder is filled Close ball valves V 1 V 2 and V 7 Open ball valve V 4 or V 5 depending on which pump you re calibrating Open ball valve V 6 and V 12 to inject chemical solution into your system Note the chemical solution level in the calibration cylinder To calibrate pump at maximum speed into your system Press the prime button on pump The pr...

Page 10: ...the mounting brackets WALL MOUNT Remove the mounting brackets using a 1 4 wrench or socket Install those same mounting brackets in the vertical position on the sides of the skid system Mount the skid system to the wall using eight 1 4 20 Bolts see fig 2 through the mounting brackets 8 0 Mounting the Chem Feed System Single and Dual System CFS System Page 8 fig 1 fig 2 ...

Page 11: ...ping 1 2 OD PVC braided tubing connections Piping Valves Unions Seal Materials X Skid Frame only without piping 200 PSI gauge with guard PTFE diaphragm A B 100 PSI gauge with guard PTFE diaphragm C 30 PSI gauge with guard PTFE diaphragm None X A E B C D Miscellaneous Options leave blank if not specified 1 Install with and ship with a specific pump model 2 Perform pressure and fluid testing with a ...

Page 12: ...well informed and aware of the precautions to be taken when injecting various chemicals especially those considered hazardous or dangerous Eye protection must be worn when working around this product Should it become necessary to return the system or system components for repair or service you must attach information regarding the chemical used as some residue may be present within the unit which ...

Reviews: