Blue-White industries flexflo A-100N Operating Manual Download Page 6

A-100N

A-100N

4.2

Electrical Connections

Be certain to connect the pump to the proper supply voltage.  Using the incorrect voltage will damage 
the pump and may result in injury.  The voltage requirement is printed on the pump serial label.

Note:

  When in doubt regarding your electrical installation, contact a licensed electrician.

The A-100N is supplied with either a ground wire conductor and a grounding type attachment plug 
(power cord) or a junction box for field wiring.

POWER CORD MODELS -

To reduce the risk of electric shock, be certain that the power cord is 

connected only to a properly grounded, grounding type receptacle.

JUNCTION BOX MODELS -

To reduce the risk of electric shock, be certain that a grounding conduc-

tor is connected to the green grounding conductor located in the junction box.

INPUT

VOLTAGE

115V 60Hz

220V 50Hz

230V 60Hz

HOT

LEADWIRE

YELLOW

YELLOW

YELLOW

NEUTRAL

LEADWIRE

BLUE

BROWN

RED

GROUND

LEADWIRE

GREEN

GREEN

GREEN

FIG. 4.5 WIRING DIAGRAM - DIGITAL TIMER

FIG. 4.6 WIRING DIAGRAM - FIXED TIMERS

FIG. 4.7 WIRING DIAGRAM - LOW FEED “SPA” PERCENTAGE TIMER

FIG. 4.8 WIRING DIAGRAM - VARIABLE SPEED CONTROLLER

T3

Neutral-l2

Hot-l1

Earth

Ground

Output

T2

T1

T4

T5

T6

Motor

Hot (yellow)

Neutral (blue/brown/red)

Common

Hot

Ground

AC

Input

Power

Circuit
Board

2A

250VAC

Protector Fuse

2 Amps, 250 Volt AC

(little Fuse #235002 or Equiv.)

Ground (green)

(factory Setting)

(factory Setting)

Power

Switch

Cycle Adjustment
Potentiometer

T3

T2

T1

AC

Input

Power

Hot

Common

Ground (green)

Timer
Board

Hot

Neutral

AC/LOAD

AC

LOAD

JB2 JB3

JB1

AC

Motor

Page 6

Page 7

Cycle Adjustment
Potentiometer

AC

Input

Power

Hot

Common

Ground (green)

Timer
Board

Hot

Neutral

AC/LOAD

AC

LOAD

JB2 JB3

JB1

AC

Motor

Momentary

By-pass

Switch

T3

T2

T1

Jb1, Jb2, Jb3 = Voltage Selector Jumpers
Jumpers Configuration
Install Jb1 & Jb3, (Jb2 left open) = 115 V AC input
Remove all jumpers (Jb1, Jb2, & Jb3 left open) = 230 V AC input

Jb1, Jb2, Jb3 = Voltage Selector Jumpers
Jumpers Configuration
Install Jb1 & Jb3, (Jb2 left open) = 115 V AC input
Remove all jumpers (Jb1, Jb2, & Jb3 left open) = 230 V AC input

Speed Adjustment
Potentiometer

120 VAC

Input

Power

Hot (yellow)

Common (white)

Red (+)

Min

Max

Black (-)

Controller

Board

DC

Motor

50

K

50

K

Summary of Contents for flexflo A-100N

Page 1: ...CTOR PUMP OPERATING MANUAL 5300 Business Drive Huntington Beach CA 92649 USA Phone 714 893 8529 FAX 714 894 9492 E mail sales blue white net Web site www blue white net INJECTOR BLUE WHITE INDUSTRIES...

Page 2: ...itally Programmable Cycle Timer The fixed speed pumping mechanism is turned on and off by an electronic timer The total time cycle is adjustable from 1 0 second through 99 seconds The on time cycle is...

Page 3: ...control available Pump Tube failure warning timer digital models 200 1 adjustment turn down ratio digital models Acceptable for outdoor use Corrosion proof Valox housing Tamper resistant electronic c...

Page 4: ...he pump tube Do not mount the pump directly over your chemical container Chemical fumes may damage the unit Mount the pump off to the side or at a lower level than the chemical container Mounting the...

Page 5: ...RIME UP C D O U T A I L Y T CYCLE 1 Strainer 7 Injector 2 Circulation Pump Blue White A 100N 3 Filter 8 Solution Tank 4 Heater 9 Injection Fitting 5 Check Valve 10 Return Line 6 Flowmeter Blue White F...

Page 6: ...electric shock be certain that the power cord is connected only to a properly grounded grounding type receptacle JUNCTION BOX MODELS To reduce the risk of electric shock be certain that a grounding co...

Page 7: ...put Power Hot Common Ground green Timer Board Hot Neutral AC LOAD AC LOAD JB2 JB3 JB1 AC Motor Momentary By pass Switch T3 T2 T1 Jb1 Jb2 Jb3 Voltage Selector Jumpers Jumpers Configuration Install Jb1...

Page 8: ...ner Drop the strainer into the solution tank 4 3 3 Outlet Tubing Compression tube models Locate the outlet fitting of the Pump Tube see fig 6 1 Remove the tube nut Push the opaque outlet discharge tub...

Page 9: ...ED VIEW 5 0 How to Operate the A 100N 5 1 How to Adjust The Output Digital Timers fig 5 1 5 1 1 Digital Programmable Timer Model The pumping mechanism is turned on and off by an electronic cycle timer...

Page 10: ...JUST CYCLE WHEN LIT STANDBY RECOMMEND TUBE CHANGE WHEN DISPLAY BLINKS CYCLE TIME ADJUSTMENT TOTAL TIME 1 TO 99 SECONDS ON TIME 1 TO 99 SECONDS SLIDE CLAMP Slide both top bottom clamps to the left only...

Page 11: ...off status depending on the power switch status when the input power was disconnected A 100N 0 100 50 75 I O 25 ON OFF BLUE WHITE INDUSTRIES L A IT U Y Q P T R C O U D PERCENTAGE OF OUTPUT 5 2 2 Fixed...

Page 12: ...the pump head chamber roller assembly and pump head cover should be wiped free of any dirt and debris The pump head cover bearing may require grease periodically Apply a small amount of grease Aerosh...

Page 13: ...the pump head cover 6 3 1 4 With the pump running pull the inlet fitting out of the pumphead Guide the tube counter clockwise away from the rollers Pull the outlet fitting out of the pump head 6 3 2 H...

Page 14: ...NECT OPTIONAL JUNCTION BOX 49 35 36 37 38 39 45 48 47 46 40 42 44 15 16 11 3 14 43 13 31 30 17 26 27 51 50 6 3 2 1 2 9 52 56 5 4 7 8 53 54 55 10 12 28 29 41 25 24 23 22 20 21 19 18 33 32 34 AD JU ST C...

Page 15: ...1 N s 70002 069 Gearmotor V speed 1 60 Rpm 90 Volts Dc 1 Item Part No Description Qty Item Part No Description Qty 18 90006 581 Fan Motor 2 25 Diameter Aluminum 1 19 70000 028 Bearing Bracket With Bea...

Page 16: ...Prepay all shipping costs COD shipments will not be accepted Warranty service must be performed by the factory or an authorized service center Damage caused by improper packaging is the responsibility...

Reviews: