BLUE SKY SOLAR BOOST 2000E Installation And Operation Manual Download Page 5

Installation and Operation Manual 

 

 

4

 

 

¾

 The 2000E front panel serves as a heat sink for power control devices. It is normal for the front panel to be quite warm to the touch 

during operation while delivering high charge current.  

 

 

PANEL LAYOUT 

 

 

 

Figure 1 

 

BATTERY LEVEL GRAPHIC 

 

 

The 2000E also provides a battery level graphic on the front panel which indicates approximate battery level versus battery voltage. The indication covers a 

fairly wide range of voltage because at a given state of charge battery voltage can vary significantly depending on whether the battery is being charged, is at rest, 
or is being discharged under load. A higher voltage is generally better than a lower voltage. 

 

A battery being charged will typically range in voltage from about 12.5 volts after charge begins to perhaps 14.0 volts or greater when the battery is highly 

charged. Once charge stops and the battery is delivering power to a load voltage will drop which is normal and typically ranges between about 12.6 volts when the 
battery is full down to about 12.2 volts when the battery is about 50% discharged. Most battery manufacturers recommend not discharging below 50% DOD (depth 
of discharge) to promote improved battery performance and life. Battery voltage will continue to fall as the battery is further discharged. Note that the voltage during 
discharge will tend to be higher under light load and lower under heavy load. NEVER allow battery voltage to drop below 10.0 volts. 

 

EQUALIZATION 

 

¾

 WARNING: Not all batteries can be safely equalized. Equalization should be performed only on vented liquid electrolyte 

lead-acid batteries. Always follow battery manufacturers recommendations pertaining to equalization. Equalization applies a 
relatively high voltage producing significant battery gassing. Disconnect equipment that cannot tolerate the high equalization 
voltage which is temperature compensated. The 2000E equalization function is fully manual and an operator should always 
plan and monitor the process. 

 

 

Equalization is essentially a controlled over charge and should only be performed on vented liquid electrolyte lead-acid batteries. Repeated 

charge/discharge cycles can lead to an imbalance in the specific gravity and state of charge of individual battery cells. Equalization brings all battery cells up to the 
same specific gravity, and eliminates electrolyte stratification by heavily gassing the battery. Periodic equalization per the battery manufacturers recommendations 
will improve battery performance and life.  

 

 

A minimum net charge current of approximately 3.5 amps per 100 amp-hours of battery capacity is required for the battery reach the equalization voltage. 

Battery voltage setpoint during equalization will be the present charge voltage setpoint plus 1.2 volts or 15.2 volts for the factory calibrated charge voltage setpoint 
of 14.0 volts. Note that with temperature compensation, the equalization voltage can be quite high at cool temperatures. The operator should disconnect equipment 
that may not tolerate the high equalization voltage applied to the battery. 

 

 

As shown in Figure 1, the blue equalization push-button is located on the 2000E panel. Equalization is enabled when the push-button is in, and the Charge 

Status LED blinks rapidly. Always follow the battery manufacturers recommendations pertaining to equalization. Equalization is normally conducted approximately 
once per month, with the battery held at the equalization voltage for a period of approximately two hours. It is best to equalize a battery that is already fully charged 
so that the desired equalization voltage is reached quickly. Following the desired equalization period, the equalization cycle is terminated and normal charge 
operation is resumed by again pressing the equalization push-button. The battery should then be topped off with distilled water per the battery manufacturers 
recommendations. 

 

CURRENT LIMIT 

 

 

If PV input power is high enough to produce more than 25 amps of output current, the 2000E will automatically prevent output current from exceeding 

25 amps to prevent overload or nuisance fuse blow.  

 

 

)

 

Summary of Contents for SOLAR BOOST 2000E

Page 1: ...G PHOTOVOLTAIC CHARGE CONTROLLER INSTALLATION AND OPERATION MANUAL THIS MANUAL INCLUDES IMPORTANT SAFETY INSTRUCTIONS FOR MODEL SB2000E SAVE THESE INSTRUCTIONS COVERED UNDER ONE OR MORE OF THE FOLLOWING US PATENTS 6 111 391 Blue Sky Energy Inc 2011 430 0012 H ...

Page 2: ...lectrostatic Handling Precautions 5 Selecting PV Modules 6 Temperature Compensation 6 Battery and PV Wiring 6 Setting Charge Voltage 7 Maximum Power Voltage 7 Optimizing MPPT 7 TROUBLESHOOTING GUIDE 8 SPECIFICATIONS 9 FIVE YEAR LIMITED WARRANTY 9 TABLES AND FIGURES Table 1 Charge Status Indicator 3 Table 2 Maximum Conductor Length 3 Voltage Drop 7 Figure 1 Front Panel and Remote Display Indicators...

Page 3: ...ry or other electrical part that may cause explosion i Remove personal metal items such as rings bracelets and watches when working with a lead acid battery A lead acid battery can produce a short circuit current high enough to weld a ring or the like to metal causing a severe burn j Remove all sources of power photovoltaic and battery before servicing or installing 4 CHARGER LOCATION INSTALLATION...

Page 4: ...ghly accurate displayed voltage may be somewhat higher than actual battery terminal voltage when high charge current is being delivered to the battery This is due to voltage drop in the wires between the 2000E and battery Error during charge can be minimized by using large low resistance wiring The 2000E operates on battery power not PV power A battery must be connected with a minimum voltage of 9...

Page 5: ... should always plan and monitor the process Equalization is essentially a controlled over charge and should only be performed on vented liquid electrolyte lead acid batteries Repeated charge discharge cycles can lead to an imbalance in the specific gravity and state of charge of individual battery cells Equalization brings all battery cells up to the same specific gravity and eliminates electrolyt...

Page 6: ...0 with a discharged battery in near freezing temperatures For a more complete MPPT description see www blueskyenergyinc com INSTALLATION WARNING Read understand and follow the Important Safety Instructions in the beginning of this manual before proceeding This unit must be installed and wired in accordance with National Electrical Code ANSI NFPA 70 Over current protection must be provided external...

Page 7: ...s recommendation Most 12 volt flooded or GEL lead acid chemistry batteries require the 30 0 millivolts C 5 00mV C cell setting NiCd and many lead acid chemistry AGM type batteries require the 20 0 millivolts C 3 33mV C cell setting WARNING Do not attach a sensor or any connections other than Blue Sky Energy battery temperature sensor p n 930 0022 20 to the temperature sensor terminals Be certain t...

Page 8: ... be eliminating the need to have the battery be highly charged To access this and other technical bulletins see www blueskyenergyinc com MAXIMUM POWER VOLTAGE The nominal setting for this adjustment is the difference between the PV panel s open circuit voltage VOC and maximum power voltage VMP These voltage values are typically listed on both the PV panel datasheet and on the rating label affixed ...

Page 9: ...cause battery voltage is at setpoint relays may switch on off This normal and will cause no harm The on off symptom will go away with a slight increase or decrease in battery voltage or load current PV BAT must not connect together external to controller for proper operation Relays click on off rapidly Dip switch 2 off Double check dip switch 2 must always be on Used for factory test only Charge s...

Page 10: ...ct of God f operation or installation contrary to instructions pertaining to the product or g cosmetic aging 4 If BSE s examination of the product determines that the product is not defective the consumer shall be charged a test and evaluation fee of 20 and be responsible for all transportation costs and insurance related to returning the product to the consumer The consumer is ultimately responsi...

Page 11: ...Blue Sky Energy Solar Boost 2000E MOUNTING TEMPLATE Figure 4 ...

Reviews: