
-71-
Revision 7/F3527
©
Moffat Ltd, November 2004
Refer new wiring diagram on next page for further information.
g)
Secure overtemp bracket to replacement panel.
h)
Fit replacement ignition box mounting panel assembly.
i)
Close control panel ensuring no trapped wires and thermostat capillary clear of HT terminal.
j)
Test unit operation.
APPENDIX A. IGNITION BOX REPLACEMENT KITS
1
2
3
4
5
1
5
4
3
2
a)
Turn off power and disconnect from electrical supply. Open control panel.
b)
Remove ignition box mounting panel assembly (2 screws).
c)
Remove overtemp bracket (c/w overtemp).
d)
Cut all cable ties.
e)
Remove wiring block from ignition box and remove HT lead.
f)
Transfer wires to terminal block of replacement ignition box assembly as shown. (1 to 1, 2 to
2 etc).
SIT Assembly (New Assembly)
Teknigas Assembly
A.1 TEKNIGAS TO SIT IGNITION BOX REPLACEMENT KIT
For G32 gas convection ovens G32H (UK)
From serial number 23020 to serial number 203926