
7. INSTALLATION INSTRUCTIONS
CONDUIT
ACCESS
HOLE
3” x 3” x 1/4”
CURB ANGLE
(supplied by others)
REAR CURB
CHANNEL AND
FRAME
ASSEMBLY
(to be poured in
place when floor
slab is poured)
7.1
Rear Curb Channel Back Frame
Installation
1.
Pour pit floor concrete into place. Allow to set.
2.
Locate the back frame and position it relative to the door
frame.
3.
Install reinforcement bars as required to support concrete.
7.2
Hydraulic Power Pack and Hose
Installation
1.
Install remote power pack in a suitable location on the wall,
at least 8’ (2438mm) above floor level.
1.
Mount Blue Genius Control Station assembly on the left side
of the door’s interior frame, at least 66 inches (1676mm)
above floor level (measure from the top of the control box to
the floor).
2.
Securely mount the exterior traffic lights and signs on the
exterior wall adjacent to the doorway (on the driver’s side), at
approximately 7 feet (2134mm) above ground level.
3.
Drill one hole through the wall to the outside for the L.E.D
control cable. Run cable through to the control box. Install
cable gland, run cable through, and tighten it.
4.
Run one 1/2” I.D. conduit from control station to the hydraulic
power pack remote I/O for the shielded communication
cable.
5.
Run one 1/2” I.D. conduit from the control station to the dock’s
hydraulic power pack motor junction box.
7.3 Electrical and Hydraulic Dock Installation
6.
Complete the electrical hookup between the exterior traffic
lights and control panel.
7.
Run hydraulic hoses (for lip and deck) from the power pack to
the dock leveler.
8.
Run control cable via conduit from the remote I/O to the dock
leveler.
For a pictorial of this procedure, see Section 6.
6 5/32"
11 29/32"
12 17/32"
1/4"
8 3/32"
1 9/32"
5"
1 1/2"
1 1/2"
CONDUIT INSTALL
AREA
NOTE:
INSTALL HIGH POWER CONDUIT
FROM BOTTOM OF PANEL.
Figure 1: Blue Genius
TM
control station dimensions
and conduit install area
FIGURE 1: NEW INSTALL
3” x 3” x 1/4”
CURB ANGLE
(supplied by others)
FIGURE 2: RETROFIT
REAR CURB
CHANNEL AND
FRAME
ASSEMBLY
(to be welded and
anchored in place)
CONDUIT
ACCESS
HOLE
The rear frame assembly must be separated from the dock leveler deck and must be poured into place when the floor slab concrete
is poured. Concrete strength is to be a minimum of 3,000 PSI, poured to a minimum thickness of 12” in all areas adjacent to the
rear frame assembly. The front face of the curb channel must be retained in a true vertical position during pour, and the finished
floor must be flush with the upper surface of the curb channel, along the full width of the frame.
U-SERIES VERTICAL STORING DOCK LEVELER WITH BLUE GENIUS™ CONTROLS
7