NO. Operation name Picture
Operation and note
1
Assemble
TP&LCD on A
shell
Insert the TP FPC into the A shell
2. Insert the LCD FPC into the A shell
3. complete as left second picture;
2
Assemble TP_IC
Conductive Fabric
,
Receiver
1
:
Assemble TP_IC conductive Fabric into
the A shell
2:Assemble Receiver into the A shell
3
Assemble
Conductive
foam,side key
component ,Motor
1
:
Assemble side key component into the
PCBA
2
:
Assemble conductive foam
3
:
Assemble motor into the PCBA
5.3 Assembling procedure
Summary of Contents for Studio Mega
Page 1: ...No 20160406 Studio Mega Service Manual ...
Page 5: ...Chart 3 Explode view and Part list 3 1 Explode view ...
Page 17: ...Chart 6 Soldering components repair Main PWB 6 1 Component layout Side key connector ...
Page 18: ...Chart 6 Soldering components repair 6 1 Component layout SUB PWB ...
Page 26: ...Chart 8 Main boards layout TOP ...
Page 27: ...Bottom ...