background image

blu

·

stone

 integrated basins 

Installation Guide 

SA0600

SA0700

SA0900

SA1200

SA1400

SA1401

SA1402

SA1800

1 866 907 0122     blubathworks.com

2015-11

SA0910

SA1210

SA1410

SA1411

SA1412

SA1810

Summary of Contents for 1200 Series

Page 1: ...ities Installation Guide FULL UP series 1800 F45V1 1800 series 700 F45V1 0700 series 900 F45V1 0900 series 1200 F45V1 1200 series 1400 F45V1 1400 series 1800 F45V2 1800 series 700 F45V2 0700 series 900 F45V2 0900 series 1200 F45V2 1200 series 1400 F45V2 1400 ...

Page 2: ...been installed Blu Bathworks responsibility for shipping damages ceases upon delivery of the product in good order to the carrier All complaints regarding damage due to transport must be made directly to the carrier 5 Place the unit in the bathroom before you start working Conserve all nuts and bolts 6 To protect the unit during installation we recommend that you lay a piece of cardboard on the bo...

Page 3: ...1 866 907 0122 blubathworks com 2016 06 2 Installation Before Installation unlock drawer s ...

Page 4: ...1 866 907 0122 blubathworks com 2016 06 3 How to Undock the Drawer Setting the Height of the Drawer ...

Page 5: ...1 866 907 0122 blubathworks com 2016 06 4 How to Unlock the Front ...

Page 6: ...corner before using it on the outer surface Accurately dry the surfaces after use Lacquered finish Clean with a soft cloth or humid non abrasive sponge using neutral and non abrasive detergents Rinse the surface carefully after cleaning Do not use aggressive chemical solvents such as acetone and trichloroethylene In case of persistent stains use a soft cloth with neutral soap or products suitable ...

Page 7: ...blu stone integrated basins Installation Guide SA0600 SA0700 SA0900 SA1200 SA1400 SA1401 SA1402 SA1800 1 866 907 0122 blubathworks com 2015 11 SA0910 SA1210 SA1410 SA1411 SA1412 SA1810 ...

Page 8: ...ping damages ceases upon delivery of the product in good order to the carrier All complaints regarding damage due to transport must be made directly to the carrier 5 Place the unit in the bathroom before you start working Conserve all nuts and bolts 6 To protect the unit during installation we recommend that you lay a piece of cardboard on the bottom 7 If the unit is covered with polyethylene prot...

Page 9: ...stallation for Integrated Basins BASIN INSTALLATION Note For deck mounted tapware refer to drilling instructions prior to the installation of the basin 1 Apply a 6mm continuous bead of silicone sealant around the top of the vanity as illustrated 2 Position the basin on top of the vanity 3 Verify that the basin is level If the basin is not level gently press down on the basin 4 Wipe away excess sil...

Page 10: ...vatory with water Check for leaks at the water supply and drain connections Drilling Instructions for Deck Mount Faucets Use a WIDIA Cemented Carbide cutter with the appropriate diameter according to the faucet manufacturer s installation guide Start drilling from the underside of the basin Applying light pressure drill and stop when the center drill has completely penetrated the basin Remove the ...

Page 11: ... or damaged surfaces blu stone matte finish Ensure there is no surface dirt by flushing with water Rub the 600 grit sanding block provided in a gentle circular motion Higher grit sandpaper may be required to blend the repaired area to match the existing product finish blu stone gloss finish Ensure there is no surface dirt by flushing with water We recommend sanding the area starting with 600 800 a...

Reviews: