background image

PRECAUTIONS AND GENERAL INFORMATION 

WARNING:

  Electric Shock Hazard 

All servicing requiring access to non-insulated components must be performed by qualified 
service personnel.  Do not open any access panels which require the use of tools.  Failure to 
heed this warning can result in electrical shock. 

 

WARNING:

  Injury Hazard 

All installation procedures must be performed by qualified personnel with full knowledge of all 
applicable electrical and plumbing codes.  Failure could result in property damage and 
personal injury. 
 

WARNING Electric Shock Hazard 

Brewer must be properly grounded to prevent possible shock hazard.  DO NOT assume a 
plumbing line will provide such a ground.  Electrical shock will cause death or serious Injury. 

 

WARNING:

  Burn Hazard 

This appliance dispenses very hot liquid.  Serious bodily injury from scalding can occur from 
contact with dispensed liquids. 

This appliance is intended for commercial use only. 

 
This appliance is intended for use to brew beverage products for 
human consumption.  No other use is recommended or  
authorized by the manufacturer or its agents. 

 
This appliance is intended for use in commercial establishments, 
where all operators are familiar with the appliance use,  
limitations and associated hazards.  Operating instructions and 
warnings must be read and understood by all operators and  
users. 

 
Except as noted, this piece of equipment is made in the USA 
and has American sizes on hardware.  All metric conversions 
are approximate and can vary in size. 

 
The following trouble shooting, component views and parts lists 
are included for general reference, and are intended for use by 
qualified service personnel. 

 
This manual should be considered a permanent part of this 
appliance.  The manual must remain with the appliance if it is 
sold or moved to another location. 
 
 
 
This brewer is          listed under UL file E9253. 
 
 
 
This brewer meets 

      

 Standard 4 only when installed,        

operated and maintained in accordance with the enclosed        
instructions. 

CAUTION:

  

Equipment 

Electrical Damage 

 

DO NOT plug in or energize this 
appliance until all 

Installation     

Instructions 

are read and followed.  

Damage to the Brewer will occur if 
these instructions are not followed. 

 

CAUTION:   
Burn Hazard  
 

Exposed surfaces of the            
appliance, brew chamber and   
decanter or dispenser may be 
HOT to the touch, and can cause 
serious burns. 

E9253

STD 4

AGENCY LISTING INFORMATION 

M6

28

 76

20

1   

Ow

n

e

rs

 M

a

nu

al

 8

7

8

1

Tea 

Br

ew

e

Summary of Contents for 8781A

Page 1: ...05 cps 628 OWNERS MANUAL for AUTOMATIC COFFEE TEA BREWERS MODEL 8781A Includes Installation Operation Use Care Servicing Instructions Model 8781A Brewer with optional 8799 3 gallon Iced Tea Dispenser...

Page 2: ...s parts warranty only excludes decanters THE FOREGOING OBLIGATION IS EXPRESSLY GIVEN IN LIEU OF ANY OTHER WARRANTIES EXPRESSED OR IMPLIED INCLUDING ANY IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS F...

Page 3: ...this appliance and to use care for and maintain or repair the appliance in a manner which will ensure its optimum performance WARRANTY STATEMENT xi SPECIFICATIONS 1 FEATURES OPERATING CONTROLS 2 PREC...

Page 4: ...FEATURES AND OPERATING CONTROLS 2 M628 76201 Owners Manual 8781A Tea Brewer...

Page 5: ...e is intended for use in commercial establishments where all operators are familiar with the appliance use limitations and associated hazards Operating instructions and warnings must be read and under...

Page 6: ...etween 20 PSI and 90 PSI If your water pressure exceeds 90 PSI at anytime a pressure regulator must be installed in the water supply line to limit the pressure to not more than 90 PSI in order to avoi...

Page 7: ...proper circuit and receptacle NSF requires that the brewer be able to be moved for cleaning underneath Loops of copper tubing will satisfy this requirement See Figure 2 below In some areas local codes...

Page 8: ...OPERATION Fig 3 Brewer Operation Diagram 6 M628 76201 Owners Manual 8781A Tea Brewer...

Page 9: ...will begin heating the water in the tank When the water has reached the proper temperature the READY TO BREW light will glow B OPERATIONAL NOTES 1 COFFEE a When brewing coffee be sure to use the coff...

Page 10: ...sending cold dilution water from an external source to the dispenser Water flowing into the tank forces a like amount of heated water out of the tank to perform the brew POUR OVER OPTION If an externa...

Page 11: ...ter under the brew chamber When the flow and all dripping stops at the end of the brew cycle the coffee is ready to serve Discard the contents of the brew chamber and rinse it in a sink When the READY...

Page 12: ...ad where it will spray over the bed of grounds Freshly brewed coffee will begin to fill the dispenser Additionally a measured amount of cold dilution water will flow from the bypass nozzle into the di...

Page 13: ...sink using warm water and a mild detergent A bristle brush may be used to clean the inside Rinse with clean water and allow to air dry 8 Wipe the exterior of the brewer with a soft clean cloth or spo...

Page 14: ...Too many filter papers or wrong filter paper Use one 1 genuine Bloomfield filter per brew Brew chamber dispense hole plugged Thoroughly clean brew chamber Wire rack not in place Install proper wire ra...

Page 15: ...of coffee per brew Freshly ground coffee beans make the best coffee beverage Be sure to use the coffee brew chamber with the tall wire rack Poor tea quality Keep brewer brew chamber and dispenser cle...

Page 16: ...tubing faucet valve and piping and switches Top panel is held by two screws at the rear and a retaining lip at the front FRONT PANEL Remove front panel to access timer wiring and bypass nozzle plumbi...

Page 17: ...ied technical personnel only NOTE Optimum brewing temperature is 195 F to 205 F 90 C to 96 C Thermostat should be adjusted to a maximum temperature of 200 F 95 C IMPORTANT A mechanical thermostatwill...

Page 18: ...Run several cycles to check amount of water delivered Replace button plug REMOVE TANK LID ASSEMBLY Unplug brewer or turn circuit breaker OFF Turn OFF water supply Remove top panel Disconnect brew fil...

Page 19: ...will not flow water Unplug power cord or turn circuit breaker OFF Turn OFF and disconnect water supply from brewer inlet fitting Unscrew water inlet fitting from solenoid Using needle nose pliers with...

Page 20: ...erse order REPLACE CONTROL PANEL LIGHT or SWITCH Unplug power cord or turn circuit breaker OFF Using Switch Removal Tool p n 83209 to remove TEA VOLUME SELECT BREW SWITCH or STOP BREW switch Use a thi...

Page 21: ...nk lid assembly as described on page 13 3 Remove the water tank from the brewer body by lifting straight up Empty all water from the tank Set the tank back into the brewer 4 Mix 2 quarts of deliming s...

Page 22: ...8781A EXPLODED VIEWS PARTS LIST 20 M628 76201 Owners Manual 8781A Tea Brewer...

Page 23: ...8781A EXPLODED VIEWS PARTS LIST continued 21 M628 76201 Owners Manual 8781A Tea Brewer...

Page 24: ...erator Disk Aerator Cap 84870 Aerator Repair Kit Includes O Ring Aerator Disk SOLENOID REPAIR KITS 73282 Solenoid Complete Dual 60 gpm 19 gpm 75685 Solenoid Complete 75 gpm with Bypass 85218 Inlet Fit...

Page 25: ...8781A WIRING DIAGRAM 23 M628 76201 Owners Manual 8781A Tea Brewer...

Page 26: ...ustries Inc Division of Carrier Commercial Refrigeration In US and Canada Telephone 775 698 5700 Fax 888 492 2783 Fax 800 356 5142 website www wellsbloomfield com for orders only PRINTED IN UNITED STA...

Reviews: