
Installation
9
Oven Assembly
4. Install inner master links. See Figure 11 and
Figure 12.
Upside-down
Proper
Position
Figure 11
Figure 12
5. Install the outer master links. See Figure 13
and Figure 14
NOTE: The extra piece of wire belt can be used to
make additional master links if the original
links are lost or damaged.
Figure 13
Figure 14