12
3. With the gas control valve, power switch and water supply all ON, water begins
entering the boiler and gas flows to the pilot: Spark will begin in 2 to 3 seconds. If
the pilot fails to light in 90 seconds, the control will provide 100% lockout. If this
occurs: Wait 5 minutes, then turn power switch off for one minute before turning
power switch back on.
4. Once the pilot is lit and the required water level has been reached, the main burners
will ignite. Burner will cycle to meet the steam pressure required. Steam pressure
should reach approximately 11 psi as indicated on the pressure gauge on the boiler.
DAILY SHUT DOWN
Turn power switch off.
Open blowdown valve if so equipped.
COMPLETE BOILER SHUT DOWN
If boiler is not intended to be operated for a lengthy period of time, shut off all power, gas
and water supplies to the appliance. Open blowdown valve if so equipped.