Drainage hole

Diagram 3. Suspended mounting

Installation options according to diagrams 4-5 are possible for the Komfort EC D5B180-E  modification.

                 

EXTRACT AIR

SUPPLY AIR

INTAKE AIR

EXHAUST AIR

                        

EXTRACT AIR

SUPPLY AIR

 

                    

Diagram 4. Wall vertical installation                                                      Diagram 5. Wall horizontal installation

CONDENSATE DRAINAGE

The Komfort EC D5B180 heat recovery units require condensate drainage.
The hole for the drain pipes is in the cover of the unit. 
Remove the plug from the hole, open the service panel and install the drain pipe from the delivery set into the hole.
The drain pipes should be installed only in the holes indicated on the diagrams.  For suspended and wall mounted horizontal installation use 
two holes on the side of the unit, for a wall-mounted vertical installation use a hole at the bottom of the unit.  Do not mount the drain pipes 
in the holes not indicated on the installation diagram.

www.blauberg.us

MUI_82_Komfot_(EC)_D5B180_EN-01

174 N. 36th Street, Lafayette, IN 47905
e-mail: [email protected]

3

Summary of Contents for Komfort EC D5B180 S14

Page 1: ...too short or not connected protect the unit parts from ingress of foreign objects To prevent uncontrollable access to the fans the spigots may be covered with a protecting grille or other protecting device with mesh width not more than 1 2 inch While installing the unit ensure convenient access for subsequent maintenance and repair The unit must be mounted on a plane wall ceiling Mounting of the u...

Page 2: ... by the Customer Service technician Unscrew the thumbscrews on the unit before attaching it to the mounting brackets Set the unit thumbscrews into the mating cutouts in the mounting brackets and tighten the thumbscrews Unit mounting example EXTRACT AIR SUPPLY AIR INTAKE AIR EXHAUST AIR Drainage hole EXTRACT AIR SUPPLY AIR Drainage hole Diagram 1 Wall vertical installation Diagram 2 Wall horizontal...

Page 3: ...ain pipes is in the cover of the unit Remove the plug from the hole open the service panel and install the drain pipe from the delivery set into the hole The drain pipes should be installed only in the holes indicated on the diagrams For suspended and wall mounted horizontal installation use two holes on the side of the unit for a wall mounted vertical installation use a hole at the bottom of the ...

Page 4: ...g to the Diagram 1 Then connect the drain pipe to the sewage system using the SG 32 U trap kit available upon separate order The pipes are required to have a minimum slope of 3 Each drain pipe is connected to a different U trap min 3 Drain hose U trap Sewage system Drain pipe www blauberg us MUI_82_Komfot_ EC _D5B180_EN 01 174 N 36th Street Lafayette IN 47905 e mail info blauberg us 4 ...

Page 5: ...nd to the unit current consumption refer to the Technical data section Connect the cables to the control unit using the electric lead ins on the side of the unit Make the electric connections through the terminal block located in the control unit in compliance with the External wiring diagram Access to the control unit External control units wiring diagram 2 3 4 14 13 12 11 10 9 8 7 6 5 15 L 1 Ext...

Reviews: