
Komfort EC d5B180(-E) S14
10
www.blauberg.us
Installation options according to diagrams 4-5 are possible for the Komfort EC D5B180-E modification.
EXTRACT AIR
SUPPLY AIR
INTAKE AIR
EXHAUST AIR
EXTRACT AIR
SUPPLY AIR
Diagram 4. Wall vertical installation Diagram 5. Wall horizontal installation
CONDENSATE DRAINAGE
The Komfort EC D5B180 heat recovery units require condensate drainage.
The hole for the drain pipes is in the cover of the unit.
Remove the plug from the hole, open the service panel and install the drain pipe from the delivery set into the hole.
The drain pipes should be installed only in the holes indicated on the diagrams. For suspended and wall mounted horizontal installation
use two holes on the side of the unit, for a wall-mounted vertical installation use a hole at the bottom of the unit. Do not mount the drain
pipes in the holes not indicated on the installation diagram.
tooltip
Drain pipe
Drain pipe
Plug
Plug
Drain hole location in case of installation according to the Diagrams 2 and 3