blaubergventilatoren.de
CiViC eC d(1)B(e; e2)
17
CONDENSATE DRAINAGE
For the units with a drain pump the flexible hose from the pump must be connected to the sewage system. The pump ensures timely
condensate drainage from the unit.
Drain pump
Flexible hose Ø 4 x 6 mm
U-trap (hydraulic lock)
Sewage system
min 50 mm
min 3°
max 3 m
The units without a drain pump are provided with a drain pan for condensate collection and drainage outside the unit by a drain pipe.
Connect the drain pipe from the unit to the sewage system.
Condensate drain pipe Ø 16x2 mm
U-trap (hydraulic lock)
Sewage system
min 100 mm
min 50 mm
min 3°
ATTENTION!
Keep the minimum slope of 3° while mounting the pipes to provide correct water drainage. Before starting operation
of the unit make sure that the water flows freely into the sewage collection system, otherwise condensed water may build up in the
unit during the heat exchanger operation, which may cause equipment failure and water ingress into the premises. The condensate
drain system is designed for use in premises with ambient temperature above 0 °C! If the expected air temperatures are below 0 °C, the
condensate drainage system must be equipped with heat insulation and preheating facilities.