background image

 

 

11 

 

Compressor 

 

Replacement or cleaning of the air filter of the compressor (item 5 page 5) is depending on the environment in 

which the Dust collector is operating.   
 

Advised is to take contact with Blastrac support in order to prevent operational problems. 

 

7. Technical data 

 

 

 

BDC-655  

Power consumption 

5.5 kW   

Connection Load 

400V, 50Hz 63A CEE plug 

Supply cable 

4 x 16mm

(15m) 

Available plug 

connections 

5 pole / 63 Ampere 

Air stream 

(hose 5” at the end) 

1250 m3/hr 

Dust hose connection 

Ø130

 / Ø150 mm 

Dust bin capacity 

100 L 

Length 

1686 mm 

Width 

795 mm 

Height 

1350 mm 

Weight 

650 kg 

 

Design and specifications are subject to change without notice by Blastrac B.V.

 

 

Summary of Contents for BDC-655

Page 1: ...OPERATING MANUAL BDC 655 VERSION 1 0...

Page 2: ...ty requirements of the European Directive for machine Safety In case of changes to the machine without our written authorization this declaration loses its validity Model Blastrac BDC 655 Serial numbe...

Page 3: ...general Safety precautions with regard to transport Safety regulations with regard to maintenance 4 Before operation 08 Checkpoints of power supply 5 Operation 08 Starting stopping the machine Work w...

Page 4: ...AA Class Designation L Low risk for separating dust with an exposure limit value of over 1 mg m3 depending on the volume occupied M BDC 655 Medium risk for separating dust with an exposure limit valu...

Page 5: ...8 Handle dust bin 2 Socket blast machine 9 Filter cartridges lifting system 3 Control box 10 Connection blast machine 4 Cable support 11 Dust bin 5 Compressor 12 Fan 6 Silencer 13 Air pistol 7 Pulse s...

Page 6: ...dust from escaping Always close the inlet of the dust collector with the appropriate plug Safety precautions with regard to maintenance To allow the user to carry out maintenance operations the dust c...

Page 7: ...n earthed connection do not change this and use always earthed cables with an earthed plug Connect the main power supply cable to an installation with an earth leakage circuit breaker Inspect and test...

Page 8: ...Starting stopping the machine Connect the dust hose to the machine Connect the dust collector to the power supply Switch on the main switch Switch on first the compressor motor Secondly switch on the...

Page 9: ...uninterrupted operation When the indicated number of working hours is not achieved during the corresponding period the period can be extended However a full overhaul must be carried out at least once...

Page 10: ...to the pulse system The cooled air passes a control valve which regulates the systems pressure and then builds up pressure in the pulse tank Normally the pressure in the system is 6 bar The safety va...

Page 11: ...prevent operational problems 7 Technical data BDC 655 Power consumption 5 5 kW Connection Load 400V 50Hz 63A CEE plug Supply cable 4 x 16mm2 15m Available plug connections 5 pole 63 Ampere Air stream...

Page 12: ...gton Sheffield South Yorkshire GB S25 3QY England Tel 0044 1909 56 91 18 Fax 0044 1909 56 75 70 Info blastrac co uk Blastrac Germany Richard Byrd Stra e 15 D 50829 K ln Ossendorf Tel 0049 221 70 90 32...

Reviews: