4.1 GAS SUPPLY
The meter and supply pipes must be capable of delivering the required quantity of gas in addition to the demand
from any other appliances connected to the same gas supply.
Refer to Technical performance data in Section 3.1 and 3.2.
The complete installation, including the meter, must be tested for gas tightness and purged as described in BS 6891.
4.2 AIR SUPPLY
The boiler does not require any air vents for cooling in the room in which it is installed or when installed in a
cupboard or compartment. The minimum clearances for servicing must always be maintained.
Note:
A cupboard or compartment used to enclose the boiler must be designed and constructed specifically for the purpose,
i.e. comply with the Building Regulations.
4.3 FLUE SYSTEM - Figs. 4.1, 4.2
The flue system must be installed in accordance with BS 5440:1.
When using a horizontal flue kit ensure that the flue outer duct is installed horizontally (please note that the flue
inner duct already has a pre-determined slope towards the boiler for condensate to run back towards the boiler).
When additional flue extensions are used, ensure the flue slopes downwards towards the boiler by a minimum of 25 - 30 mm
per metre of flue.
Horizontal and vertical flue assemblies should be supported every metre with access provided to the joints.
All joints between flue sections should be connected using the clamps provided. It is not required to add additional screws
through the clamps and into the flue sections.
Additional flue components are available as follows:-
CD EasyFlue 500 mm telescopic terminal - Part No. 6.12000510.
CD EasyFlue 1000 mm telescopic terminal - Part No. 6.12001010.
CD 750 mm flue extension - Part No. 6.2000750.
CD 1000 mm flue extension - Part No. 6.2001050.
CD 100 mm flue support brackets (pack of 5) - Part No. 6.1000355.
CD 90° bend - Part No. 6.2000590.
CD 45° bend - Part No. 6.2000545.
CD Vertical flue terminal kit - Part No. 6.2000520. Refer to the separate installation instructions supplied with the kit.
Flue support brackets - Part No. 6.1000355.
Terminal guard - Part No. 6.2000570.
Additional flue accessories and plume management are also available.
Note: 1.
If an extra 90° bend is used, this reduces the maximum flue length by 1.3 m. Each 45° bend used reduces the
maximum flue length by 0.9 m.
2.
Under no circumstances must the flue length (including allowances for extra bends) exceed 12 metres horizontally
and only 14 metres vertically.
3.
Failure to use Alpha flue components with the boiler will invalidate the boilers CE approval, guarantee and may be
unsafe.
4 GENERAL BOILER INFORMATION
Alpha E-Tec S 20, 30 and 35 - General Boiler Information
Summary of Contents for PREMIUM PLUS WHP030
Page 2: ......
Page 6: ...4 Blade 30 and 40 Water Heater Plus Manual July 2020 3 0 WATER HEATER SCHEMATIC LAYOUT...
Page 7: ...Blade 30 and 40 Water Heater Plus Manual July 2020 5 3 1 SCHEMATIC LEGEND...
Page 18: ...16 Blade 30 and 40 Water Heater Plus Manual July 2020 9 0 MAINTENANCE AND SERVICING CLEARANCES...
Page 19: ...Blade 30 and 40 Water Heater Plus Manual July 2020 17 10 0 FRAME DETAILS...
Page 20: ...18 Blade 30 and 40 Water Heater Plus Manual July 2020 11 0 INSTALLATION SCHEMATIC LAYOUT...
Page 23: ...Blade 30 and 40 Water Heater Plus Manual July 2020 21 14 0 WIRING DIAGRAM...
Page 31: ...Blade 30 and 40 Water Heater Plus Manual July 2020 29 Notes...
Page 32: ...APPENDIX A ALPHA BOILER MANUAL...
Page 91: ...59 Alpha E Tec S 20 30 and 35 Page intentionally Blank...
Page 101: ...Blade 30 and 40 Water Heater Plus Manual July 2020 31 APPENDIX B DAB PUMP MANUAL...
Page 115: ...ENGLISH 41 It is dangerous to touch the circulator DANGER OF SCALDING...
Page 125: ...ENGLISH 51 18 PERFORMANCE CURVES EVOSTA2 40 70 XXX...
Page 126: ...ENGLISH 52 EVOSTA2 80 XXX...
Page 127: ...ENGLISH 53 EVOSTA3 40 XXX...
Page 128: ...ENGLISH 54 EVOSTA3 60 XXX...
Page 129: ...ENGLISH 55 EVOSTA3 80 XXX...