MESSERSCHMITT BF-109E Item code: BH146
.
Instruction Manual
12
When you are sure that everything is aligned cor-
rectly, mix up a generous amount of 30 minute epoxy.
Apply a thin layer to the top and bottom of the stabilizer
mounting area and to the stabilizer mounting platform
sides in the fuselage. Slide the stabilizer in place and
re-align. Double check all of your measurements one
more time before the epoxy cures. Remove any ex-
cess epoxy using a paper towel and rubbing alcohol
and hold the stabilizer in place with T-pins or masking
tape.
Bottom side.
control horn
1. A+B Epoxy glue
2. Push in
Elevator control horn
Drill a hole
1.5 mm
A/B Epoxy glue
After the epoxy has fully cured, remove the masking
tape or T-pins used to hold the stabilizer in place and
carefully inspect the glue joints. Use more epoxy to fill
in any gaps that may exits that were not filled previ-
ously and clean up the excess using a paper towel and
rubbing alcohol.
Top side
C/A glue.
M2 Lock nut
M2
Elevator pushrod
Bottom side.
Silicone Tube
1. ELEVATOR CONTROL HORN
INSTALLATION
Elevator control horn install as same as the way of
aileron control horn. Please see pictures below.
2. ELEVATOR PUSHROD INSTALLATION
1)
Using pliers, carefully make a 90 degree bend
down at the mark made. Cut off the excess wire, leaving
about 6mm beyond the blend.
2)
Insert the 90 degree bend down through the
hole in the servo arm. Install one nylon snap keeper
over the wire to secure it to the arm. Install the servo
arm retaining screw.
Elevator
servo
Elevator pushrod
Secure.
Cut.
Snap keeper
Secure.
Flaslink
Pushrod wire
servo arm